A composite generation-transmission system reliability assessment method based on clustering of optimal multiplier vector

被引:0
|
作者
Zhang, Lizi [1 ]
Wang, Qian [1 ]
Shu, Jun [1 ]
机构
[1] North China Electric Power University, Beijing 102206, China
关键词
Probability distributions - Reliability analysis - Intelligent systems - Computational efficiency - Importance sampling - Vector spaces - Electric power transmission - Vectors;
D O I
暂无
中图分类号
学科分类号
摘要
Monte Carlo simulation (MCS) method is an important method for composite generation-transmission system reliability assessment. However, the precision of MCS results and the computing time required are contradictory to each other. Optimal multiplier vector can be used to change the probability distribution of the sample space, reduce the variance, and subsequently speed up the MCS process. Existing optimal multiplier methods either use a large number of multipliers to improve the accuracy and increase the computing time, or use a small number of multipliers to improve computing speed and reduce the results accuracy. In order to reflect the different types of components and improve computational efficiency, the sensitivity analyzing method and clustering components which have significant impact on system reliability is proposed. A clustering optimal multiplier vector with the minimum goal of pre-sample variance is proposed as well to obtain similar results calculated by conventional Monte Carlo method, but requires smaller sampling number and less computing time. The convergence speed of the presented method is verified using the IEEE-RTS 79 test system. © 2011 State Grid Electric Power Research Institute Press.
引用
下载
收藏
页码:14 / 19
相关论文
共 50 条
  • [1] Imprecise reliability assessment of composite generation-transmission system considering interval probability
    Qi, Xianjun
    Wang, Xingqiang
    Huang, Xiangyu
    Dianwang Jishu/Power System Technology, 2014, 38 (05): : 1203 - 1209
  • [2] Methodology for reliability evaluation of bulk composite generation-transmission system
    School of Electrical Engineering, Shandong University, Jinan 250061, China
    Gaodianya Jishu, 2007, 7 (191-194): : 191 - 194
  • [3] Integrated generation-transmission expansion planning considering power system reliability and optimal maintenance activities
    Mahdavi, Meisam
    Javadi, Mohammad S.
    Catalao, Joao P. S.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2023, 145
  • [4] Genetic algorithms approach for the evaluation of composite generation-transmission systems reliability worth
    Samaan, N
    Singh, C
    2003 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, CONFERENCE PROCEEDINGS: BLAZING TRAILS IN ENERGY DELIVERY AND SERVICES, 2003, : 113 - 119
  • [5] Reliability assessment of composite generation and transmission system with wind farms
    Jiang, Wen
    Yan, Zheng
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2010, 30 (04): : 5 - 9
  • [6] Reliability Assessment of Composite Generation and Transmission System with Wind Farms
    Jiang, Wen
    Hu, Zhi
    Yan, Zheng
    RENEWABLE AND SUSTAINABLE ENERGY, PTS 1-7, 2012, 347-353 : 879 - 883
  • [7] Composite Generation and Transmission System Reliability Assessment Using Impact Increment-based State Fnumeration Method
    Hou, Kai
    Jia, Hongjie
    Yu, Xiaodan
    Li, Yawen
    Xie, Chang
    Yan, Jianfeng
    2016 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2016,
  • [8] Reliability assessment of composite generation and transmission system considering wind farms
    Jiang, Wen
    Yan, Zheng
    Yang, Jian-Lin
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (22): : 126 - 130
  • [9] Study on Reliability Assessment of Composite Generation and Transmission System Integrated Wind Farm
    Cao, Fang
    Gao, Xiang
    Yu, Junwei
    2012 IEEE INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2012,
  • [10] LAGRANGE MULTIPLIER METHOD FOR OPTIMAL RELIABILITY ALLOCATION IN A SERIES SYSTEM
    GOVIL, KK
    AGARWALA, RA
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 1983, 6 (03) : 181 - 190