共 50 条
Can we make maintenance decisions on risk analysis results
被引:8
|作者:
Backlund, F.
[1
]
Hannu, J.
[1
]
机构:
[1] Centre for Dependability/Maintenance, Luleå University of Technology, Luleå, Sweden
关键词:
Decision making - Hydroelectric power plants - Maintenance - Sensitivity analysis;
D O I:
10.1108/13552510210420603
中图分类号:
学科分类号:
摘要:
For several branches of industry, an increasingly competitive environment has raised important questions concerning maintenance in plant systems. For example, the 1996 deregulation in Sweden s electricity sector has resulted in increased competition among the country's power producers. To survive the competition, suppliers have to reduce maintenance costs, i.e. handle maintenance more efficiently. Risk analysis is one tool decision makers can use to help them prioritise as they plan maintenance actions. There are a number of different approaches to risk analysis. As the results of an analysis must form a reliable basis for decision making, it is important to consider whether the quality of the results will vary significantly with the risk analysis approach chosen. This paper presents a comparative study based on three independent risk analyses performed on a specific hydro-power plant. The comparison and evaluation of the analyses reveal major differences in performance and results, along with various factors that affect the quality of the analyses. The study establishes the importance of a well-planned requirement specification and the need to analyse and interpret risk analysis results, before making maintenance decisions.
引用
收藏
页码:77 / 91
相关论文