Construction of the railway superstructure of the Rome-Naples high speed line - Organization and material logistic

被引:0
|
作者
Pisu, Clemente
机构
来源
Ingegneria Ferroviaria | 2003年 / 58卷 / 10期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:895 / 902
相关论文
共 50 条
  • [41] Development of design and construction of high-speed railway bridges in Germany
    Kang, Chongjie
    Schneider, Sebastian
    Wenner, Marc
    Marx, Steffen
    ENGINEERING STRUCTURES, 2018, 163 : 184 - 196
  • [42] Study on Supporting Technology for Mechanized Construction of High Speed Railway Tunnel
    Gao, Jun
    Lin, Xiao
    PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON EDUCATION SCIENCE AND ECONOMIC MANAGEMENT (ICESEM 2017), 2017, 106 : 411 - 414
  • [43] The Global High-Speed Railway Construction and Its Geopolitical Implications
    Lin Limin
    Hong Jianjun
    Contemporary International Relations, 2014, 24 (04) : 85 - 102
  • [44] Train working diagram system of high and middle speed train on JingHu high speed railway line
    Ma, JJ
    Hu, SJ
    Chen, Y
    Li, JT
    TRAFFIC AND TRANSPORTATION STUDIES, 2000, : 957 - 962
  • [45] SOME TECHNICAL ASPECTS OF THE CONSTRUCTION OF THE NEW HIGH SPEED RAILWAY IN MEXICO
    Gomez, Roberto
    Escobar, Alberto J.
    Cecilio, Victor
    Mendoza, Marco A.
    Arenas, Luis M.
    ROAD AND RAIL INFRASTRUCTURE V, 2018, : 729 - 737
  • [46] The influence of construction residual stress and sextuple-line train load on the high-speed railway frame structure
    Zhang, Moyan
    Xiao, Hong
    Wang, Jiaqi
    Nadakatti, Mahantesh M.
    Wang, Yang
    Chen, Peng
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 324
  • [47] Tunnel Construction in a Large Landslide - Wuyi Tunnel of the High Speed Railway Line Hefei-Fuzhou, PR China
    Stingl, V.
    Neumann, P.
    Kirschner, H.
    BAUINGENIEUR, 2017, 92 : 550 - 557
  • [48] The influence of construction residual stress and sextuple-line train load on the high-speed railway frame structure
    Zhang M.
    Xiao H.
    Wang J.
    Nadakatti M.M.
    Wang Y.
    Chen P.
    Construction and Building Materials, 2022, 324
  • [49] Cyclic Timetable Scheduling Problem on High-speed Railway Line
    Xu W.
    Tan Y.
    Sharma B.
    Wang Z.
    Periodica Polytechnica Transportation Engineering, 2019, 48 (01): : 31 - 38
  • [50] The Bologna to Florence high speed railway line: Progress of underground works
    Lunardi, P
    Focaracci, A
    CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 585 - 593