Set-up times are reduced for rubber processing

被引:0
|
作者
Fischer, David L. [1 ]
机构
[1] Hilma Division of Carr Lane Roemheld, United States
来源
Rubber World | 2010年 / 243卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:14 / 15
相关论文
共 50 条
  • [21] The flexible blocking job shop with transfer and set-up times
    Groeflin, Heinz
    Dinh Nguyen Pham
    Buergy, Reinhard
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2011, 22 (02) : 121 - 144
  • [22] Optimizing Set-Up Times Using the HeuristicLab Optimization Environment
    Karder, Johannes
    Scheibenpflug, Andreas
    Wagner, Stefan
    Affenzeller, Michael
    COMPUTER AIDED SYSTEMS THEORY - EUROCAST 2015, 2015, 9520 : 286 - 293
  • [23] Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
    Cetinkaya, Ferda Can, 1600, Macmillan Press Ltd, Hants, United Kingdom (45):
  • [24] Completion times in multipurpose batch plants with set-up, transfer and clean-up times.
    Grau, R
    Espuna, A
    Puigjaner, L
    COMPUTERS & CHEMICAL ENGINEERING, 1996, 20 : S1143 - S1148
  • [25] SET-UP OF INJECTION MOLDS - SYSTEMATIC SET-UP OF INJECTION MOLDS
    KURTH, D
    F&M-FEINWERKTECHNIK & MESSTECHNIK, 1987, 95 (05): : ZM136 - ZM138
  • [26] SET-UP OF INJECTION MOLDS - SYSTEMATIC SET-UP OF INJECTION MOLDS
    KURTH, D
    KUNSTSTOFFE-GERMAN PLASTICS, 1987, 77 (07): : ZM136 - ZM138
  • [29] Marking the set-up
    Curtin, Joseph
    STRAD, 2012, 123 (1466): : 68 - 70
  • [30] Stochastic sequencing with job families, set-up times, and due dates
    Van Oyen, MP
    Duenyas, I
    Tsai, CY
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1999, 30 (02) : 175 - 181