An improvement on the feedwater regulation scheme for a 300 MW thermal power plant simulation unit

被引:0
|
作者
机构
来源
| 2001年 / Harbin Research Institute卷 / 16期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
In the course of the adjustment test of a simulation unit the design defects of the original control scheme of a feedwater automatic control system were analyzed and on this basis an improved scheme was proposed. After a modification of the related design modules and procedures of the simulation unit the regulation quality of the feedwater regulation system has been greatly enhanced. This brought about the realization of a formerly unachievable protection function, which has been verified and confirmed in production practice. It is noted that the simulation unit can be employed not only to conduct on-the-post training but also possesses a highly effective adjustment-test function.
引用
收藏
相关论文
共 50 条
  • [31] INVESTIGATING THE STARTING PROCEDURES FOR A 250 MW POWER GENERATING-UNIT WITH REDUCED FEEDWATER FLOWRATES
    GLUSKER, BN
    BERSENEV, AP
    LYSAKOVSKII, VE
    NIKITIN, VA
    NOSOV, BN
    THERMAL ENGINEERING, 1983, 30 (12) : 720 - 723
  • [32] Study of Numerical Simulation and Experimental of Gas Flow Distribution of Electric Composite Filter Bag in 300MW Power Unit in Coal-fired Power Plant
    Dang Xiaoqing
    Hu Hongsheng
    2010 4TH INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING (ICBBE 2010), 2010,
  • [33] Exergy analysis of a 300 MW lignite thermoelectric power plant
    Koroneos, Christopher J.
    Fokaides, Paris A.
    Christoforou, Elias A.
    ENERGY, 2014, 75 : 304 - 311
  • [34] PILOT-PLANT TESTING OF RADIAL PREFILTER IN 300 MW UNIT AT TROITSK-CENTRAL-POWER-STATION
    PROKHOROV, FG
    KHODYREV, BN
    LOMACHENKO, GN
    PISMAN, BY
    THERMAL ENGINEERING, 1975, 22 (07) : 7 - 11
  • [35] STARTING A 300MW UNIT FROM DIFFERENT THERMAL STATES
    KAZARINO.SI
    ABKIN, BV
    SURKOVA, AF
    LISOVOI, VG
    THERMAL ENGINEERING, 1968, 15 (03) : 1 - &
  • [36] Exergy Analysis of a 210 MW Unit at 1260 MW Thermal Plant in India
    Goyal, Varun
    Dang, Rakesh
    Dondapati, Rajasekhar
    Mangal, S. K.
    2014 2ND INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE, MODELLING AND SIMULATION, 2014, : 228 - 233
  • [37] Improvement of the Efficacy of Operation of the P-67 Boiler in an 800 MW Power Plant Unit.
    Apatovskii, L.E.
    Lipets, A.U.
    Mochan, S.I.
    Sotnikov, I.A.
    Shvartsman, S.Ya.
    Sheptun, V.I.
    1600,
  • [38] OVER-EXCITATION OF A NO-LOAD 300 MW POWER UNIT
    ZIKHERMAN, MK
    KURBANGALIEV, UK
    KUZMIN, GP
    ELECTRICAL TECHNOLOGY RUSSIA, 1971, 3 : 66 - +
  • [39] COMMERCIAL TESTS OF DIFFERENT VERSIONS OF FUEL AND FEEDWATER AUTOMATIC CONTROL FOR PK-39 BOILER OF A 300 MW UNIT
    KORETSKII, AS
    FOTEEVA, LV
    NEMERSKII, BV
    THERMAL ENGINEERING, 1969, 16 (04) : 7 - +
  • [40] Advanced simulation control application of full scope simulator for Qinshan 300MW Nuclear Power Unit
    Tu, Shaoning
    Hedongli Gongcheng/Nuclear Power Engineering, 1996, 17 (02): : 125 - 128