共 50 条
- [31] Improved NSGA- II algorithm to solve energy-saving scheduling problem of flexible job shop considering transportation constraints Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (09): : 3028 - 3040
- [33] Research on the Dual-resource Constrained Robust Job Shop Scheduling Problems Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2021, 57 (04): : 227 - 239
- [36] Multi-start Tabu Agents-Based Model for the Dual-Resource Constrained Flexible Job Shop Scheduling Problem COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2022, 2022, 13501 : 674 - 686
- [37] Energy-saving scheduling method for flexible Job shop integrating equipment Status control Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (11): : 3889 - 3900
- [39] A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem Chinese Journal of Mechanical Engineering, 2019, 32
- [40] A modified genetic algorithm approach to flexible job shop scheduling problem 2015 3RD INTERNATIONAL CONFERENCE ON MANUFACTURING ENGINEERING AND TECHNOLOGY FOR MANUFACTURING GROWTH (METMG 2015), 2015, : 138 - 142