Using graduate assistants as project advisers for externally-sponsored capstone design projects

被引:0
|
作者
机构
[1] Hyder, Imran
[2] Arnold, Drew
[3] Calvo-Amodio, Javier
[4] Parmigiani, John P.
来源
| 1600年 / Tempus Publications卷 / 30期
关键词
Students;
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
相关论文
共 30 条
  • [21] Using a Design Project to Instill Empathy in Structural Engineering Teaching Assistants
    Kjolsing, Eric
    Van den Einde, Lelli
    Todd, Michael
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2016, 142 (03)
  • [22] Studying Learner's Perception of Attaining Graduate Attributes in Capstone Project Units Using Online Flipped Classroom
    Memon, Tayab D.
    Jurin, Monica
    Kwan, Paul
    Jan, Tony
    Sidnal, Nandini
    Nafi, Nazmus
    EDUCATION SCIENCES, 2021, 11 (11):
  • [23] Experiences using the Xilinx Microblaze softcore processor and uCLinux in computer engineering capstone senior design projects
    Klenke, Robert H.
    2007 IEEE INTERNATIONAL CONFERENCE ON MICROELECTRONIC SYSTEMS EDUCATION, PROCEEDINGS, 2007, : 123 - 124
  • [24] USING MINI-PROJECTS TO FOSTER STUDENT COLLABORATION IN MULTI-DISCIPLINARY CAPSTONE DESIGN COURSE
    Stansbury, Richard S.
    Barott, William C.
    Salamah, Salamah
    2012 ASEE ANNUAL CONFERENCE, 2012,
  • [25] USING A P3 FUNDED PROJECT AS PART OF A CAPSTONE DESIGN CLASS IN ENVIRONMENTAL ENGINEERING
    Grimberg, Stefan J.
    2012 ASEE ANNUAL CONFERENCE, 2012,
  • [26] Capstone Design Projects, the Project Value Map and the Many Eyes Process: Balancing Process and Product to Deliver Measurable Value to Student and Client
    Browne, Chris
    Johns-Boast, Lynette
    Blackmore, Kim
    Flint, Shayne
    INTERNATIONAL JOURNAL OF ENGINEERING EDUCATION, 2020, 36 (02) : 586 - 599
  • [27] A CASE STUDY OF USING CAPSTONE DESIGN AS BASIS FOR CURRICULUM-WIDE PROJECT-BASED LEARNING
    Hyman, Barry
    Khanna, Sanjeev
    Lin, Yuyi
    Borgford-Parnell, Jim
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2011, VOL 5, 2012, : 41 - 46
  • [28] Design and implementation of project time management risk assessment tool for SME projects using oracle application express
    Sharif, Abdullahi Mohamud
    Rozan, Mohd Zaidi Abd
    World Academy of Science, Engineering and Technology, 2010, 41 : 1221 - 1226
  • [29] Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-span Steel-box Arch Bridge Project (Retraction of vol 11, 125, 2014)
    Liu, Wenping
    Guo, Hongling
    Li, Heng
    Li, Yan
    INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2015, 12
  • [30] RETRACTED: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-span Steel-box Arch Bridge Project (Retracted article. See vol. 12, 96, 2015)
    Liu, Wenping
    Guo, Hongling
    Li, Heng
    Li, Yan
    INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2014, 11