CTCS-3 to CTCS-2 train control system level transition method in specific scenarios of crossing the line

被引:0
|
作者
Xiang, Shou-Kuan [1 ]
机构
[1] China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan,Hubei,430063, China
关键词
Control systems;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Research purposes: There have been difficulties in signal design of CTCS-3 to CTCS-2 level transition between the stations in complex hub, it is necessary to analyze the principles, summarize the practical engineering cases, and extract the user-friendly design methods for future similar scenarios to provide reference for engineering design. Research conclusions: (1) The fundamental conditions of CTCS-3 to CTCS-2 level transition is: the distance from YG-3/2 balise group to the CZ balise group should be greater than 450 m, the distance from the YG-3/2 balise group to ZX-3/2 balise group should be greater than 5s traveled distance at maximum allowable line speed, the scope of the RBC data configuration should extend at least one braking distance from the execution point. (2) When two CTCS-3 yards in a row integrate and belong to two different RBC, the CTCS-3 to CTCS-2 level transition can be carried out on the cross-field line between the two yard, the CTCS-3 to CTCS-2 level transition can be carried out after running across the cross-field lines, then it achieves the RBC handover. (3) When two CTCS-3 and CTCS-2 yards in a row integrate and have more than two cross-field lines, CTCS-3 to CTCS-2 level transition can be carried on two cross-field lines. (4) When the length of the cross-field line between CTCS-3 yard to CTCS-2 yard does not meet the basic conditions of level transition, the CTCS-3 to CTCS-2 level transition point can be set on the CTCS-2 line. (5) The research conclusions can provide a reference for the signal design of train control system when there exists cross-filed line. ©, 2015, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
下载
收藏
页码:91 / 95
相关论文
共 50 条
  • [41] Formalization Model and Safety Analyses of High Speed Train in CTCS-3 Control Mode
    Cheng Xiangjun
    Du Peng
    2013 INTERNATIONAL CONFERENCE ON MECHANICAL AND AUTOMATION ENGINEERING (MAEE 2013), 2013, : 161 - 167
  • [42] 离去区段CTCS-3级向CTCS-2级列控系统等级转换测试用例研究
    雷群
    铁道通信信号, 2024, 60 (12) : 26 - 32
  • [43] Enhanced robustness of control network for Chinese Train Control System Level-3 (CTCS-3) facilitated by software-defined networking architecture
    Li, Saifei
    Yan, Lianshan
    Xing, Huanlai
    Cui, Yunhe
    Pan, Wei
    Guo, Jin
    Guo, Wei
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2014, 2 (04) : 239 - 252
  • [44] Modeling and analyzing on board-wayside radio communication subsystem of CTCS-3 level train control system based on SimEvents/stateflow
    Zhao, Huibing
    Li, Yi
    Quan, Hongyu
    Zhongguo Tiedao Kexue/China Railway Science, 2015, 36 (04): : 115 - 121
  • [45] 郑西客专CTCS-3与CTCS-2临时限速设置一致性分析
    袁娟
    铁路通信信号工程技术, 2009, 6 (01) : 30 - 33
  • [46] CTCS-2/CTCS-3等级线路引入京津城际工程中列控系统设计的探讨
    张弛
    铁路通信信号工程技术, 2013, 10 (05) : 11 - 15
  • [47] CTCS-2级列控系统升级改造为CTCS-3级的工程实施方案及经验总结
    周桂强
    韦木建
    何罡
    易蓬
    铁道通信信号, 2024, 60 (12) : 119 - 125
  • [48] Reliability Analysis of CTCS-3 Train-Ground Communication System Based on 5G-R
    Sun, Bin
    Guo, Yue
    Yu, Yaojia
    Liu, Jintao
    Ai, Bo
    Zhong, Zhangdui
    Sun, Xiaofang
    Wang, Wei
    IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2023, 72 (10) : 12927 - 12940
  • [49] Performance Improvement Method for CTCS-3 with ATO System under Wireless Packet Delay and Loss
    Sun, Wenzhe
    Cheng, Jianfeng
    Liu, Jiquan
    Zhang, Yu
    Zhao, Xiaoyu
    2021 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE (ITSC), 2021, : 1035 - 1040
  • [50] Analysis of Requirement-errors-caused Failure of On-board Subsystem of CTCS-3 Train Control System Based on Failure Logs
    Han, Xiao
    Tang, Tao
    Lü, Jidong
    Shang, Linyu
    Tiedao Xuebao/Journal of the China Railway Society, 2017, 39 (03): : 59 - 70