CTCS-3 to CTCS-2 train control system level transition method in specific scenarios of crossing the line

被引:0
|
作者
Xiang, Shou-Kuan [1 ]
机构
[1] China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan,Hubei,430063, China
关键词
Control systems;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Research purposes: There have been difficulties in signal design of CTCS-3 to CTCS-2 level transition between the stations in complex hub, it is necessary to analyze the principles, summarize the practical engineering cases, and extract the user-friendly design methods for future similar scenarios to provide reference for engineering design. Research conclusions: (1) The fundamental conditions of CTCS-3 to CTCS-2 level transition is: the distance from YG-3/2 balise group to the CZ balise group should be greater than 450 m, the distance from the YG-3/2 balise group to ZX-3/2 balise group should be greater than 5s traveled distance at maximum allowable line speed, the scope of the RBC data configuration should extend at least one braking distance from the execution point. (2) When two CTCS-3 yards in a row integrate and belong to two different RBC, the CTCS-3 to CTCS-2 level transition can be carried out on the cross-field line between the two yard, the CTCS-3 to CTCS-2 level transition can be carried out after running across the cross-field lines, then it achieves the RBC handover. (3) When two CTCS-3 and CTCS-2 yards in a row integrate and have more than two cross-field lines, CTCS-3 to CTCS-2 level transition can be carried on two cross-field lines. (4) When the length of the cross-field line between CTCS-3 yard to CTCS-2 yard does not meet the basic conditions of level transition, the CTCS-3 to CTCS-2 level transition point can be set on the CTCS-2 line. (5) The research conclusions can provide a reference for the signal design of train control system when there exists cross-filed line. ©, 2015, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
下载
收藏
页码:91 / 95
相关论文
共 50 条
  • [1] The optimization method for the dynamic testing of CTCS-3 level train control system
    Zhou, Wei
    Cheng, Xiandong
    Zhao, Hongjun
    Wang, Shuai
    Zhongguo Tiedao Kexue/China Railway Science, 2010, 31 (05): : 102 - 107
  • [2] CTCS-3级列控车载设备CTCS-3及CTCS-2信息融合研究
    陈志强
    铁路通信信号工程技术, 2014, 11 (05) : 1 - 3
  • [3] The automatic testing platform of CTCS-3 level train control system based on AdmiTest
    He, Guangyu
    Fan, Ming
    Cheng, Jianfeng
    Huang, Hongfu
    Zhongguo Tiedao Kexue/China Railway Science, 2013, 34 (04): : 128 - 136
  • [4] Research on Automatic Analysis of interoperability testing of CTCS-3 Level Train Control System
    Yang, Sen
    Tang, Tao
    Liu, Yu
    2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 803 - 807
  • [5] CTCS-2系统和CTCS-3系统分析优化研究
    齐华
    价值工程, 2016, 35 (03) : 153 - 156
  • [6] Research on method of modeling and formal verification of the CTCS-3 train control system specification
    Xie Y.-F.
    Tang T.
    Xu T.-H.
    Zhao L.
    Tiedao Xuebao/Journal of the China Railway Society, 2011, 33 (07): : 67 - 72
  • [7] CTCS-2级与CTCS-3级列控设备对比研究
    陈果
    袁楷智
    陈舟劢
    河南科技, 2018, (25) : 99 - 100
  • [8] CTCS-3级与CTCS-2级列控车载设备对比研究
    王玉
    王强
    程剑锋
    孙帝
    铁道通信信号, 2017, 53 (03) : 8 - 11
  • [9] CTCS-2至CTCS-3等级转换的研究及仿真
    曹雅鑫
    铁路计算机应用, 2016, 25 (01) : 44 - 47
  • [10] CTCS-2级及CTCS-3级列控系统方案优化探讨
    董继芬
    价值工程, 2014, 33 (24) : 73 - 74