Discussion of the modification plan of the EPB TBM applied in a water-rich cobblestone stratum in Chengdu

被引:0
|
作者
Wang, Guoyi [1 ]
机构
[1] The 2nd Engineering Co. Ltd. of China Railway No.13 Group Co. Ltd., Shenzhen 518083, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The shield construction technique was successfully used in the Chengdu metro lines 1 and 2. Because of the geological conditions of water-rich cobblestone, this project suffered from a high cost of cutter consumption, difficult cutter changing, surface subsidence, and serious wear to the cutter head and screw conveyor. By analyzing the geological features and advantages and disadvantages of the devices currently used on shield machines, a modification plan for the shield is suggested, including changing from a breasting plate to a spoke for the cutter head, from a shaft to belt for the conveyor, and from main breaking to total discharging, which resulted in greatly reduced construction costs.
引用
收藏
页码:34 / 39
相关论文
共 50 条
  • [41] Construction Response and Control of Subway Station Crossing Water-Rich Fault in Heterogeneous Soft-Hard Composite Stratum
    Song G.
    Li H.
    Zhong K.
    Lyu X.
    Wang W.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2023, 55 (03): : 110 - 120
  • [42] A new stage control device for open TBM tunnel lining support in water-rich weakly cemented soft rock
    Kang, Xin
    Xie, Xiongyao
    Zou, Jia
    Lei, Shengxiang
    Zhou, Biao
    Dong, Qijun
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2024, 179
  • [43] Numerical investigation on the spewing mechanism of earth pressure balance shield in a high-pressure water-rich sand stratum
    Zhiyong Yang
    Weiqiang Qi
    Yanjie Ding
    Yusheng Jiang
    Xinkang Yang
    Xing Yang
    Xiaokang Shao
    DeepUndergroundScienceandEngineering, 2023, 2 (01) : 74 - 87
  • [44] Adaptability of the Cutter-Head of the Earth Pressure Balance (EPB) Shield Machine in Water-Rich Sandy and Cobble Strata: A Case Study
    Wan, Chaodong
    Jin, Zhiyi
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [45] Settlement Analysis of Mud-Water Shield Passing Full-Face Water-Rich Sand and Cobble Stratum Under Luo River
    Huang, Jianghua
    Xu, Ping
    Huang, Zhenlei
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (01) : 535 - 542
  • [46] DISCUSSION ON WATER-RICH CHARACTERISTICS AND ITS POSITION IN FRACTURED STRUCTURE ZONES WITH DIFFERENT MECHANICAL-PROPERTIES
    DERONG, L
    SHUAN, Y
    SCIENTIA GEOLOGICA SINICA, 1975, (03): : 220 - 229
  • [47] Settlement Analysis of Mud-Water Shield Passing Full-Face Water-Rich Sand and Cobble Stratum Under Luo River
    Jianghua Huang
    Ping Xu
    Zhenlei Huang
    Geotechnical and Geological Engineering, 2024, 42 : 535 - 542
  • [49] Disturbance characteristics test about double-line shield tunnel excavation in grouting-reinforced water-rich sand stratum
    Liu, Yu
    Cheng, Xuansheng
    Sun, Haodong
    Ding, Kai
    Wei, Qingbo
    Ding, Huidong
    ENGINEERING RESEARCH EXPRESS, 2024, 6 (02):
  • [50] Microscopic Experiments and Numerical Simulation of Foam-Conditioned Soil for Earth Pressure Balance Shield Tunneling in Water-Rich Sandy Stratum
    Wan, Zeen
    Li, Shuchen
    Hao, Sihaowensong
    Zhao, Shisen
    Wang, Zhe
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2025, 25 (01)