Effect of Deployment of Jack-Up on Piles and Structure of Existing Offshore platform—A Case Study

被引:0
|
作者
Institute of Engineering and Ocean Technology , ONGC, Panvel, Maharashtra, India [1 ]
机构
来源
Lect. Notes Civ. Eng. | 2366年 / 641-652期
关键词
D O I
Indian Geotechnical Conference, IGC 2019
中图分类号
学科分类号
摘要
Piles
引用
收藏
相关论文
共 50 条
  • [21] Mooring positioning performance of jack-up platform
    Tang, Wenxian
    Zhuang, Hong
    Tang, Zhenxin
    Guo, Sheng
    Yan, Fei
    Zhuang, Hong (zhuanghong@just.edu.cn), 1600, Taylor and Francis Ltd. (15): : 633 - 644
  • [22] Mooring positioning performance of jack-up platform
    Tang, Wenxian
    Zhuang, Hong
    Tang, Zhenxin
    Guo, Sheng
    Yan, Fei
    SHIPS AND OFFSHORE STRUCTURES, 2020, 15 (06) : 633 - 644
  • [23] OFFSHORE LAUNCHING OF JACK-UP UNITS: AN EXPERIMENTAL APPROACH
    Rodriguez, Claudio A.
    Esperanca, Paulo T. T.
    Moura, Mario
    Raigorodsky, Jacques
    PROCEEDINGS OF THE ASME 32ND INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING - 2013 - VOL 1: OFFSHORE TECHNOLOGY, 2013,
  • [24] FOUNDATION PERFORMANCE OF OFFSHORE JACK-UP DRILLING RIGS
    YOUNG, AG
    REMMES, BD
    MEYER, BJ
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1984, 110 (07): : 841 - 859
  • [25] Electroslag Remelting Withdrawing Technology for Offshore Jack-up Platform Rack Steel Manufacturing Process
    Zang, Xi-min
    Qiu, Tian-yu
    Li, Wan-ming
    Deng, Xin
    Jiang, Zhou-hua
    Song, Hua
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2016, 23 (04) : 297 - 304
  • [26] Spudcan bearing capacity calculation of the offshore jack-up drilling platform during the preloading process
    Zhang, Puyang
    Yu, Xiaoyang
    Ding, Hongyan
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2011, 38 (05): : 613 - 619
  • [27] Collision Analysis Between Spudcan and Seabed During the Process of Jack-up Platform Lowering Jack-up Legs
    LE Cong-huan
    LI Yan-e
    HUANG Lei
    REN Jian-yu
    DING Hong-yan
    ZHANG Pu-yang
    China Ocean Engineering, 2021, 35 (05) : 779 - 788
  • [28] Electroslag Remelting Withdrawing Technology for Offshore Jack-up Platform Rack Steel Manufacturing Process
    Xi-min ZANG
    Tian-yu QIU
    Wan-ming LI
    Xin DENG
    Zhou-hua JIANG
    Hua SONG
    Journal of Iron and Steel Research(International), 2016, 23 (04) : 297 - 304
  • [29] Electroslag remelting withdrawing technology for offshore jack-up platform rack steel manufacturing process
    Xi-min Zang
    Tian-yu Qiu
    Wan-ming Li
    Xin Deng
    Zhou-hua Jiang
    Hua Song
    Journal of Iron and Steel Research International, 2016, 23 : 297 - 304
  • [30] Experimental study on influencing factors of hydrodynamic coefficient for jack-up platform
    Tian, Xiaojie
    Liu, Yunxiang
    Liu, Guijie
    Xie, Yingchun
    Wang, Shuqing
    OCEAN ENGINEERING, 2019, 193