共 50 条
- [42] Heuristic Gupta-based flexible flow-shop scheduling algorithm Proc IEEE Int Conf Syst Man Cybern, 1600, (319-322):
- [44] Two-stage proportionate flexible flow shop to minimize the makespan Journal of Combinatorial Optimization, 2013, 25 : 123 - 134
- [46] Energy-Aware Scheduling of Two-Stage Flexible Flow Shop Based on Group Technology: Consideration of the Inconsistency of Process Differences International Journal of Computational Intelligence Systems, 15
- [48] An improved shuffled frog leaping algorithm for the distributed two-stage hybrid flow shop scheduling Lei, De-Ming (deminglei11@163.com), 1600, Northeast University (36): : 241 - 248
- [50] Solving the two-stage hybrid flow shop scheduling problem based on mutant firefly algorithm Journal of Ambient Intelligence and Humanized Computing, 2019, 10 : 979 - 990