Heuristic algorithm for two-stage flexible flow shop scheduling with tail group constraint

被引:0
|
作者
Li, Zhantao [1 ]
Chen, Qingxin [1 ]
Mao, Ning [1 ]
机构
[1] Key Laboratory of Computer Integrated Manufacturing System of Guangdong Province, Guangdong University of Technology, Guangzhou 510006, China
关键词
Heuristic methods;
D O I
10.3901/JME.2013.12.183
中图分类号
学科分类号
摘要
引用
收藏
页码:183 / 192
相关论文
共 50 条
  • [41] Lot streaming in a two-stage assembly hybrid flow shop scheduling problem with a work shift constraint
    Nejati, Mohsen
    Mahdavi, Iraj
    Hassanzadeh, Reza
    Mahdavi-Amiri, Nezam
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (07) : 459 - 471
  • [42] Heuristic Gupta-based flexible flow-shop scheduling algorithm
    I-Shou Univ, Kaohsiung, Taiwan
    Proc IEEE Int Conf Syst Man Cybern, 1600, (319-322):
  • [43] A heuristic method for two-stage hybrid flow shop with dedicated machines
    Wang, Shijin
    Liu, Ming
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) : 438 - 450
  • [44] Two-stage proportionate flexible flow shop to minimize the makespan
    Byung-Cheon Choi
    Kangbok Lee
    Journal of Combinatorial Optimization, 2013, 25 : 123 - 134
  • [45] Two-stage proportionate flexible flow shop to minimize the makespan
    Choi, Byung-Cheon
    Lee, Kangbok
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2013, 25 (01) : 123 - 134
  • [46] Energy-Aware Scheduling of Two-Stage Flexible Flow Shop Based on Group Technology: Consideration of the Inconsistency of Process Differences
    Zhiqiang Zeng
    Le Gao
    Zhiyong Hong
    International Journal of Computational Intelligence Systems, 15
  • [47] Energy-Aware Scheduling of Two-Stage Flexible Flow Shop Based on Group Technology: Consideration of the Inconsistency of Process Differences
    Zeng, Zhiqiang
    Gao, Le
    Hong, Zhiyong
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2022, 15 (01)
  • [48] An improved shuffled frog leaping algorithm for the distributed two-stage hybrid flow shop scheduling
    Lei D.-M.
    Wang T.
    Lei, De-Ming (deminglei11@163.com), 1600, Northeast University (36): : 241 - 248
  • [49] A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem
    Deng, Jin
    Wang, Ling
    Wang, Sheng-yao
    Zheng, Xiao-long
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (12) : 3561 - 3577
  • [50] Solving the two-stage hybrid flow shop scheduling problem based on mutant firefly algorithm
    Beibei Fan
    Wenwei Yang
    Zaifang Zhang
    Journal of Ambient Intelligence and Humanized Computing, 2019, 10 : 979 - 990