Renovation of underground existing pressure pipeline

被引:0
|
作者
PALTEM, GEO Engineering Unit, Safety and Fire Protection Equipment PALTEM, GEO Company, Ashimori Industry Co., Ltd. [1 ]
机构
来源
Kami Pa Gikyoshi | 2008年 / 9卷 / 46-52+030期
关键词
Water supply;
D O I
10.2524/jtappij.62.1136
中图分类号
学科分类号
摘要
引用
收藏
页码:46 / 52
相关论文
共 50 条
  • [31] Renovation of a steel water pipeline after the Izmit earthquake
    Pipes and Pipelines International, 2001, 46 (06): : 19 - 22
  • [32] Pressure pipe renovation and replacement
    Hayward, Paul
    No-Dig International, 1997, 8 (10):
  • [33] TESTING METHODS FOR UNDERGROUND PIPELINE COATINGS
    PARTRIDGE, PE
    MATERIALS PERFORMANCE, 1991, 30 (12) : 22 - 24
  • [34] On intelligent checking of underground pipeline data
    Huang, Hong
    Gong, Jianya
    Zhong, Zheng
    Geomatics and Information Science of Wuhan University, 2007, 32 (08) : 731 - 734
  • [35] STABILIZATION OF THE POSITION OF AN UNDERGROUND PIPELINE IN PERMAFROST
    Kutvitskaya, N. B.
    Gorbunova, O. V.
    Kaurkin, V. D.
    Ryazanov, A. V.
    SOIL MECHANICS AND FOUNDATION ENGINEERING, 2011, 48 (05) : 208 - 213
  • [36] Evaluation of underground pipeline construction options
    Gokhale, S
    Hastak, M
    Vedder, R
    UNDERGROUND INFRASTRUCTURE RESEARCH: MUNICIPAL, INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS, 2001, : 343 - 347
  • [37] Failure analysis - Unusual occurrence causes leak in high-pressure underground gas pipeline
    Saatchi, A
    Aghajani, A
    Alavi, F
    MATERIALS PERFORMANCE, 2006, 45 (03) : 52 - 55
  • [38] Stabilization of the position of an underground pipeline in permafrost
    Kutvitskaya N.B.
    Gorbunova O.V.
    Kaurkin V.D.
    Ryazanov A.V.
    Soil Mechanics and Foundation Engineering, 2011, 48 (5) : 208 - 213
  • [39] Impact of an unsecured excavation on an underground pipeline
    Ossowski, R.
    Szarf, K.
    ADVANCES IN MECHANICS: THEORETICAL, COMPUTATIONAL AND INTERDISCIPLINARY ISSUES, 2016, : 445 - 448
  • [40] Seismic loading on underground pipeline systems
    Butenweg, C.
    Schmitt, T.
    Rosen, B.
    BAUINGENIEUR, 2014, 89 : 316 - 324