Re-entrant flexible scheduling: Models, algorithms and applications

被引:0
|
作者
Chen, Tong [1 ,2 ]
Qin, Yuan-Hui [3 ]
Wan, Jia-Ning [4 ]
Wang, Dong-Jun [3 ]
Liu, Bo [1 ]
机构
[1] Academy of Mathematics and Systems Science, Chinese Academy of Sciences, Beijing,100190, China
[2] School of Economics and Management, Beihang University, Beijing,100191, China
[3] Systems Engineering Research Institute, Beijing,100094, China
[4] Department of Postgraduate, National Defense University, Beijing,100091, China
关键词
Constructive heuristics - Dispatching rules - Exact solution - Flexible scheduling - Hybrid algorithms - Improvement heuristics;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1187 / 1201
相关论文
共 50 条
  • [41] Approximate analysis of re-entrant lines with Bernoulli reliability models
    Wang, Chong
    Li, Jingshan
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1-3, 2007, : 221 - 226
  • [42] Network flow modeling for flexible manufacturing systems with re-entrant lines
    Hindi, Haitharn
    Ruml, Wheeler
    PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1043 - 1050
  • [43] Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach
    Gomes, Marta Castilho
    Barbosa-Povoa, Ana Paula
    Novais, Augusto Queiroz
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (17) : 5120 - 5141
  • [44] Minimizing total completion time for re-entrant flow shop scheduling problems
    Jing, Caixia
    Huang, Wanzhen
    Tang, Guochun
    THEORETICAL COMPUTER SCIENCE, 2011, 412 (48) : 6712 - 6719
  • [45] Relative value function approximation for the capacitated re-entrant line scheduling problem
    Choi, JY
    Reveliotis, S
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2005, 2 (03) : 285 - 299
  • [46] A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem
    Chen, Jen-Shiang
    Pan, Jason Chao-Hsien
    Lin, Chien-Min
    EXPERT SYSTEMS WITH APPLICATIONS, 2008, 34 (01) : 570 - 577
  • [47] A re-entrant hybrid flow shop scheduling problem with machine eligibility constraints
    Zhang, Xiang Yi
    Chen, Lu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5293 - 5305
  • [48] Modelling and Simulation of Re-Entrant Flow Shop Scheduling: An Application in Semiconductor Manufacturing
    El-Khouly, Ingy A.
    El-Kilany, Khaled S.
    El-Sayed, Aziz E.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 211 - 216
  • [49] OPTIMIZATION BY PRE-ASSIGNMENT OF PROCESSES FOR RE-ENTRANT FLOWSHOP SCHEDULING PROBLEM
    Hino, Rei
    Osada, Tomoya
    PROCEEDINGS OF THE ASME/ISCIE INTERNATIONAL SYMPOSIUM ON FLEXIBLE AUTOMATION, ISFA 2012, 2013, : 333 - 336
  • [50] Re-entrant Production Scheduling Problem Under Uncertainty Based On QPSO Algorithm
    Pan, Fengshan
    Ye, Chunming
    Zhou, Jihua
    MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 1061 - 1066