Simulations of field-development planning help improve economics of heavy-oil project

被引:0
|
作者
Teotico D. [1 ]
Schauerte L. [1 ]
Griffith J. [1 ]
Schottle G. [2 ]
Mehl R. [2 ]
机构
[1] Shell, Australia
[2] Halliburton, Australia
来源
SPE Economics and Management | 2010年 / 2卷 / 02期
关键词
Value engineering;
D O I
10.2118/124203-PA
中图分类号
学科分类号
摘要
When Shell began an ultraheavy-oil development in Alberta, Canada, the field plan was based on manual pad positioning without consideration for surface hazards, trajectory constraints, or injector/producer slot requirements arising from the prefabricated-pad configuration. Shell teams were challenged to investigate alternative field-development plans to reduce the initial investment. The volume of wells, surface hazards, trajectory constraints, and pad slot configuration requirements for injector/producer ratios made this a formidable task. Shell leveraged the expertise of third-party consultants and powerful software to generate numerous development scenarios, which enabled the Shell staff to focus on the economics of each plan. An aerial image that delineated surface hazards, an elevation grid, and injector/producer targets were loaded into the 3D subsurfacevisualization environment of the software to generate pad-placement simulations, including trajectory designs. The software followed the Shell planning constraints and avoided all surface hazards. The analyses were conducted for the highest, lowest, and median number of pads. From these three scenarios, a value analysis was plotted. This value analysis enabled the planning team to identify the optimal surface-to-reservoir configuration and to maximize the value of the field by delivering all of the reservoir targets, while minimizing the number of pads needed to drill. The output also yielded field cumulative values, including total and nominal well length, to support future economic analyses. The analysis determined that 87 pads maximized the value of the field when 42-slot configured pads were considered. Additional studies determined that when 50-slot configured pads were considered, more than 99% of the planned reservoir targets could be drilled from 72 major and four or fewer minor pads. In either case, a significant reduction from the original 98 pads was realized. Through the combined efforts of Shell engineers and third-party consultants, as well as the use of state-of-the-art software, this optimization was completed in only 8 worker-weeks. This paper describes the software and processes used to reduce Shell's estimated field-development costs and to minimize the environmental effect of the field by reducing the number of pads required. Copyright © 2010 Society of Petroleum Engineers.
引用
收藏
页码:75 / 79
页数:4
相关论文
共 50 条
  • [1] Multilateral wells improve development in heavy-oil field
    1600, Society of Petroleum Engineers (SPE) (56):
  • [2] Multilateral wells improve development in heavy-oil field
    Denney, D
    JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (07): : 65 - 66
  • [3] Integrated field-development planning for mature oil fields
    Anon
    JPT, Journal of Petroleum Technology, 2000, 52 (02): : 46 - 47
  • [4] Integrated field-development planning for mature oil fields
    Fabel, G
    Neunhöffer, T
    Rudschinski, D
    Sasse, J
    Scheer, T
    JOURNAL OF PETROLEUM TECHNOLOGY, 2000, 52 (02): : 46 - 47
  • [5] Challenges for offshore heavy-oil field development
    Wehunt, C.D.
    Burke, N.E.
    Noonan, S.G.
    Bard, T.R.
    JPT, Journal of Petroleum Technology, 2003, 55 (06): : 66 - 67
  • [6] Integrated field-development planning
    Woodside Energy Ltd, Australia
    JPT J Pet Technol, 4 (40-42):
  • [7] Integrated field-development planning
    不详
    JOURNAL OF PETROLEUM TECHNOLOGY, 1999, 51 (04): : 40 - 42
  • [8] Appraisal and development plan for the heavy-oil jubarte field
    不详
    JOURNAL OF PETROLEUM TECHNOLOGY, 2004, 56 (06): : 60 - +
  • [9] FIELD DEVELOPMENT OPTIONS FOR A WATERFLOODED HEAVY-OIL RESERVOIR
    KASRAIE, M
    SAMMON, PH
    JESPERSEN, PJ
    JOURNAL OF PETROLEUM TECHNOLOGY, 1993, 45 (09): : 888 - 894
  • [10] DEVELOPMENT OF HEAVY-OIL RESERVOIRS
    BRIGGS, PJ
    BARON, RP
    FULLEYLOVE, RJ
    WRIGHT, MS
    JOURNAL OF PETROLEUM TECHNOLOGY, 1988, 40 (02): : 206 - 214