Lost-sales reduction on coordinated vendor-buyer models of a two-stage supply chain with stochastic supply lead-Time

被引:0
|
作者
Lin H.-J. [1 ,2 ]
机构
[1] Department of Applied Mathematics, Aletheia University, Tamsui
[2] Department of Finance and Actuarial Science, Aletheia University, Tamsui
来源
Lin, Hsien-Jen (au4409@mail.au.edu.tw) | 1600年 / Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland卷 / 26期
关键词
Inventory; Lost sales; Reorder point; Stochastic lead time; Supply chain;
D O I
10.1504/IJISE.2017.085210
中图分类号
学科分类号
摘要
This paper is concerned with the problem of lost sales reduction in an integrated vendor-buyer supply chain model with stochastic lead time. We consider that lost sales rate can be reduced through further investment. By framing the model, we observe that a significant amount of savings can be achieved to increase the competitive edge. The objective is to derive the optimal production and shipment policy, and the optimal investment strategy in reducing lost sales for the integrated vendor-buyer system with partial backordering under stochastic lead time. A computer code using the software Mathematica 7 is developed to derive the optimal solution. Furthermore, the effects of the parameters associated with the model are also studied. Finally, we provide numerical examples to illustrate the results. © 2017 Inderscience Enterprises Ltd.
引用
下载
收藏
页码:549 / 566
页数:17
相关论文
共 50 条
  • [21] Integrated decision models for a vendor-buyer supply chain with inspection errors and purchase and repair options
    Khan, Mehmood
    Ahmad, Abdul-Rahim
    Hussain, Matloub
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 104 (9-12): : 3221 - 3228
  • [22] A coordinated vendor-buyer system considering loss and damage claims, insurance cost and stochastic lead time
    Wangsa, Ivan Darma
    Wee, Hui Ming
    Tseng, Shih-Hsien
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2019, 10 (03) : 384 - 398
  • [23] Minimizing response time in a two-stage supply chain system with variable lead time and stochastic demand
    Lodree, E
    Jang, WS
    Klein, CM
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (11) : 2263 - 2278
  • [24] Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint
    Taleizadeh, Ata Allah
    Niaki, Seyed Taghi Akhavan
    Makui, Ahmad
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (05) : 5338 - 5348
  • [25] Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction
    Chang, HC
    Ouyang, LY
    Wu, KS
    Ho, CH
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 170 (02) : 481 - 495
  • [26] Supply chain coordination with controllable lead-time and stochastic transportation-time
    Cui Jiabao
    Wang Xiaoli
    PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 1, 2011, : 141 - 146
  • [27] Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction
    Malik, Asif Iqbal
    Sarkar, Biswajit
    MATHEMATICS, 2019, 7 (05)
  • [28] Impact of uncertain demand and lead-time reduction on two-echelon supply chain
    Sarkar, Sumon
    Tiwari, Sunil
    Giri, B. C.
    ANNALS OF OPERATIONS RESEARCH, 2022, 315 (02) : 2027 - 2055
  • [29] Impact of uncertain demand and lead-time reduction on two-echelon supply chain
    Sumon Sarkar
    Sunil Tiwari
    B. C. Giri
    Annals of Operations Research, 2022, 315 : 2027 - 2055
  • [30] Transportation lead time reduction in a vendor managed inventory supply chain
    Wang, Xiaojing
    Liu, Zhixue
    Zheng, Changzheng
    Wu, Jianbo
    PROCEEDINGS OF THE 2008 INTERNATIONAL CONFERENCE ON E-RISK MANAGEMENT (ICERM 2008), 2008, : 140 - 145