共 50 条
- [31] Raising the navigation flux of the Three-Gorges open tunnel during flood period Shuiyun Gongcheng/Port & Waterway Engineering, 1999, (09): : 27 - 30
- [32] Overview of cascade operation of the Three Gorges Project in cofferdam power generation period with Gezhouba project Shuili Fadian Xuebao, 2006, 6 (8-15):
- [33] Study on the Regulation Scheme of Sedimentation Reduction during the Water Level Downfall Period of the Three Gorges Reservoir PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS I AND II, 2013, : 6202 - 6210
- [34] Study on the geotechnical engineering problems at Three Gorges Project PROCEEDINGS OF THE 16TH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOLS 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 295 - 301
- [37] Overview on hydraulic design of the flood-release deep outlets of Three Gorges project Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2010, 29 (02): : 31 - 35
- [38] Research on Industrial Heritage Protection and Utilization at Project Operating Period - the Three Gorges Project Museum Plan PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS I AND II, 2013, : 1623 - 1628
- [39] Preliminary exploration of design flood and control water level of Three Gorges Reservoir in operation period Shuili Xuebao/Journal of Hydraulic Engineering, 2019, 50 (11): : 1311 - 1317and1325