Technology of temporary plugging heat cleaning for oil pumping and well

被引:0
|
作者
Cheng, Yuhui [1 ]
Huang, Yihan [1 ]
Jing, Buhong [1 ]
Tang, Yuanchun [1 ]
Shen, Xiaoxiang [1 ]
Huang, Ju [1 ]
机构
[1] Second Oil Production Factory, Jiangsu Oilfield, Jinhu, Jiangsu 211600, China
来源
Drilling and Production Technology | 2004年 / 27卷 / 02期
关键词
Cleaning - Cost effectiveness - Crude petroleum - Deformation - Leakage (fluid) - Oil well testing - Pressure effects;
D O I
暂无
中图分类号
学科分类号
摘要
Heat cleaning of oil pumping well make formation leakage and damage serious in water - sensitivity and low formation pressure, so the shielding temporary plugging technology is adopted. By lab. test, we select DCX - 01 temporary plugging agent and apply in the thermal well cleanout. The experiments of 4 wells in Wei2 fault block show that the loss of crude oil is decresed by 298t compared with general heat cleaning, and good economic benefit has been obtained. Meanwhile, the technology solves the problem of formation damage.
引用
收藏
页码:84 / 86
相关论文
共 50 条
  • [41] Study of the Plugging of Oil Well Sand Control Area in a Polymer Flooding Region
    Liu, Dong
    Liu, Huiqing
    Hou, Jian
    Li, Zhuo
    Zhao, A-Zhen
    Li, Li
    Zhou, Chengshi
    Sun, Huili
    OIL & GAS SCIENCE AND TECHNOLOGY-REVUE D IFP ENERGIES NOUVELLES, 2012, 67 (03): : 403 - 411
  • [42] SOME FACTORS INFLUENCING THE PLUGGING CHARACTERISTICS OF AN OIL-WELL INJECTION WATER
    CERINI, WF
    BATTLES, WR
    JONES, PH
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1946, 165 : 52 - 63
  • [43] The Improved Grey Correlation Fault Diagnosis for Oil Pumping Well
    Wang, Xiufang
    Guan, Chuang
    Ga, Running
    PROCEEDINGS OF 2013 2ND INTERNATIONAL CONFERENCE ON MEASUREMENT, INFORMATION AND CONTROL (ICMIC 2013), VOLS 1 & 2, 2013, : 1184 - 1187
  • [44] Diagnostics of Oil Well Pumping Equipment by Using Machine Learning
    Abdurakipov, S. S.
    Dushkin, M.
    Del'tsov, D.
    Butakov, E. B.
    JOURNAL OF ENGINEERING THERMOPHYSICS, 2024, 33 (01) : 39 - 54
  • [45] HEAT PIPE TAPS OIL WELL
    不详
    NEW SCIENTIST, 1984, 101 (1402) : 27 - 27
  • [46] Cellulose nanofiber-reinforced supramolecular polymer gels for temporary plugging of fractured oil and gas reservoirs
    Dai, Liyao
    Sun, Jinsheng
    Lv, Kaihe
    Liu, Fengbao
    Bai, Yingrui
    Liao, Bo
    Yang, Dongqing
    Liu, Chaozheng
    Li, Mei-Chun
    CARBOHYDRATE POLYMERS, 2025, 356
  • [47] Applying oil-soluble resin as temporary plugging agent to protecting reservoir in the Xiaoguai faulted block
    Wang, Song
    Hu, Sanqin
    Luo, Juesheng
    Lei, Yiming
    Huang, Lei
    Yu, Xueqing
    Zhong, Xia
    Jianghan Shiyou Xueyuan Xuebao/Journal of Jianghan Petroleum Institute, 1998, 20 (02): : 66 - 70
  • [48] Preparation and properties of degradable hydrogels as a temporary plugging agent used for acidizing treatments to enhance oil recovery
    Wang, Kailu
    Liu, Guozhen
    Guo, Yingying
    Yang, Huan
    Chen, Zihao
    Su, Gaoshen
    Wang, Yanqing
    Wei, Bing
    Yu, Xiaorong
    COLLOIDS AND SURFACES A-PHYSICOCHEMICAL AND ENGINEERING ASPECTS, 2022, 637
  • [49] HISTORICAL ANALYSIS OF OIL AND GAS WELL PLUGGING IN NEW YORK: IS THE REGULATORY SYSTEM WORKING?
    Bishop, Ronald E.
    NEW SOLUTIONS-A JOURNAL OF ENVIRONMENTAL AND OCCUPATIONAL HEALTH POLICY, 2013, 23 (01) : 103 - 116
  • [50] EXPERIMENTAL STUDY ON THE CHEMICAL CLEANING TECHNOLOGY OF OIL SLUDGE IN OFFSHORE OIL TANK
    Wang, Longting
    Sun, Liping
    Kang, Jichuan
    Wang, Yanfu
    FRESENIUS ENVIRONMENTAL BULLETIN, 2020, 29 (01): : 544 - 550