Degree of maturity based factory planning and project monitoring: Methodology of automated determination of the progress of the project based on digital planning results

被引:0
|
作者
Mertins, Kai
Rabe, Markus
Glinitzki, Sven
机构
来源
关键词
D O I
10.3139/104.101098
中图分类号
学科分类号
摘要
引用
收藏
页码:22 / 23
相关论文
共 50 条
  • [31] Project-MEMO - Integrated process based enterprise-resource and project planning
    Fraunholz, B
    Schauer, H
    INFORMATION TECHNOLOGY AND ORGANIZATIONS: TRENDS, ISSUES, CHALLENGES AND SOLUTIONS, VOLS 1 AND 2, 2003, : 256 - 259
  • [32] Search-based techniques applied to optimization of project planning for a massive maintenance project
    Antoniol, G
    Di Penta, M
    Harman, M
    ICSM 2005: PROCEEDINGS OF THE 21ST IEEE INTERNATIONAL CONFERENCE ON SOFTWARE MAINTENANCE, 2005, : 240 - 249
  • [33] Project and portfolio planning cycle. Project-based management for the multiproject challenge
    Platje, Adri
    Seidel, Harald
    Wadman, Sipke
    International Journal of Project Management, 1994, 12 (02) : 100 - 106
  • [34] Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach
    Li, Duanshun
    Lu, Ming
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (01)
  • [35] Software for project-based learning of robot motion planning
    Moll, Mark
    Bordeaux, Janice
    Kavraki, Lydia E.
    COMPUTER SCIENCE EDUCATION, 2013, 23 (04) : 332 - 348
  • [36] Intelligent Estimation Agent Based on CMMI Ontology for Project Planning
    Lee, Chang-Shing
    Wang, Mei-Hui
    Yan, Zhi-Rong
    Lo, Chi-Fang
    Chuang, Hao-Han
    Lin, Yi-Chen
    2008 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), VOLS 1-6, 2008, : 228 - +
  • [37] PROCESS-BASED SIMULATION LIBRARY FOR CONSTRUCTION PROJECT PLANNING
    Scherer, Raimar
    Ismail, Ali
    PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 3488 - 3499
  • [38] Linear-programming-based heuristics for project capacity planning
    Gademann, N
    Schutten, M
    IIE TRANSACTIONS, 2005, 37 (02) : 153 - 165
  • [39] Simulation Based Planning of the Fuzzy Front End Stage of a Project
    Huz, Michal
    Shtub, Avraham
    CIRP 25TH DESIGN CONFERENCE INNOVATIVE PRODUCT CREATION, 2015, 36 : 106 - 110
  • [40] Multi-project planning based on critical chain method
    Luo Xue-tao
    Li Yuan
    Wang Yong-chao
    ISTM/2007: 7TH INTERNATIONAL SYMPOSIUM ON TEST AND MEASUREMENT, VOLS 1-7, CONFERENCE PROCEEDINGS, 2007, : 6486 - 6489