Degree of maturity based factory planning and project monitoring: Methodology of automated determination of the progress of the project based on digital planning results

被引:0
|
作者
Mertins, Kai
Rabe, Markus
Glinitzki, Sven
机构
来源
关键词
D O I
10.3139/104.101098
中图分类号
学科分类号
摘要
引用
收藏
页码:22 / 23
相关论文
共 50 条
  • [1] A new innovation project maturity assessment methodology based on innovation degree
    Claire, Johan
    Galvez, Daniel
    Boly, Vincent
    Camargo, Mauricio
    Claire, Johan
    2014 INTERNATIONAL ICE CONFERENCE ON ENGINEERING, TECHNOLOGY AND INNOVATION (ICE), 2014,
  • [3] Case Study on Project Risk Management Planning Based on Soft System Methodology
    Xie Lifang
    Li Jun
    CUTTING-EDGE RESEARCH TOPICS ON MULTIPLE CRITERIA DECISION MAKING, PROCEEDINGS, 2009, 35 : 37 - 44
  • [4] Planning and implementing an evidence-based project
    Marchiondo, Kathleen
    NURSE EDUCATOR, 2006, 31 (01) : 4 - 6
  • [5] Network-based project planning and scheduling
    Khamooshi, H
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 1996, 96 (08) : 13 - &
  • [6] Network-based project planning and scheduling
    Nene Coll of Higher Education, Northampton, United Kingdom
    Ind Manage Data Sys, 8 (13-22):
  • [7] Process Model Based Incremental Project Planning
    Fischer, Edward
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2010, PT 2, PROCEEDINGS, 2010, 6017 : 285 - 300
  • [8] Design of Project Based Positioning and Project Planning System for Mobile Employee
    Arslan, Halil
    Yuksek, A. Gurkan
    Gun, Osman
    2018 26TH SIGNAL PROCESSING AND COMMUNICATIONS APPLICATIONS CONFERENCE (SIU), 2018,
  • [9] Methodology of logistics planning based on project management and system dynamics for business service providers
    Kalenatic, Dusko
    Mancera Mendez, Luz Helena
    Moreno Valbuena, Karol Viviana
    Gonzalez Rodriguez, Leonardo Jose
    REVISTA FACULTAD DE INGENIERIA-UNIVERSIDAD DE ANTIOQUIA, 2011, (58): : 208 - 218
  • [10] Deconstruction project planning of existing buildings based on automated acquisition and reconstruction of building information
    Volk, Rebekka
    Thu Huong Luu
    Mueller-Roemer, Johannes Sebastian
    Sevilmis, Neyir
    Schultmann, Frank
    AUTOMATION IN CONSTRUCTION, 2018, 91 : 226 - 245