Operation performance of an A/A/O process coupled with excess sludge ozonation and phosphorus recovery: A pilot-scale study

被引:0
|
作者
20150600499669
机构
[1] Qiang, Zhimin
[2] Wang, Lu
[3] Dong, Huiyu
[4] Qu, Jiuhui
来源
Qiang, Zhimin (qiangz@rcees.ac.cn) | 1600年 / Elsevier B.V., Netherlands卷 / 268期
关键词
Chemical oxygen demand;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Performance comparison of a pilot-scale UASB and DHS system and activated sludge process for the treatment of municipal wastewater
    Tandukar, Madan
    Ohashi, A.
    Harada, H.
    WATER RESEARCH, 2007, 41 (12) : 2697 - 2705
  • [32] Efficiency of a pilot-scale integrated sludge thickening and digestion reactor in treating low-organic excess sludge
    He, Qiang
    Li, Jiang
    Liu, Hongxia
    Tang, Chuandong
    de Koning, Jaap
    Spanjers, Henri
    ENVIRONMENTAL TECHNOLOGY, 2012, 33 (12) : 1403 - 1408
  • [33] Long-term operation of a pilot-scale reactor for phosphorus recovery as struvite from source-separated urine
    Zamora, Patricia
    Georgieva, Tanya
    Salcedo, Inmaculada
    Elzinga, Nico
    Kuntke, Philipp
    Buisman, Cees J. N.
    JOURNAL OF CHEMICAL TECHNOLOGY AND BIOTECHNOLOGY, 2017, 92 (05) : 1035 - 1045
  • [34] Phosphorus Recovery from Sewage in a Pilot-Scale UASB-DHS System
    Nurmiyanto, A.
    Kodera, H.
    Kindaichi, T.
    Ozaki, N.
    Ohashi, A.
    FRONTIERS IN WASTEWATER TREATMENT AND MODELLING, FICWTM 2017, 2017, 4 : 22 - 29
  • [35] Pilot-scale phosphorus recovery from mobile toilet wastewater in Bangkok, Thailand
    Thanakrit Neamhom
    Pakasinee Yakam
    Chalermkiet Bathbumrung
    Wirunya Tachavarong
    Varakorn Kosaisavee
    Yada Pinatha
    Scientific Reports, 15 (1)
  • [36] Pilot-scale evaluation of micropollutant abatements by conventional ozonation, UV/O3, and an electro-peroxone process
    Yao, Weikun
    Rehman, Syed Waqi Ur
    Wang, Huijiao
    Yang, Hongwei
    Yu, Gang
    Wang, Yujue
    WATER RESEARCH, 2018, 138 : 106 - 117
  • [37] Pilot-Scale Operation of a Concrete Sludge Recycling Plant and Simultaneous Production of Calcium Carbonate
    Iizuka, Atsushi
    Sasaki, Takeshi
    Honma, Masato
    Yoshida, Hiroyuki
    Hayakawa, Yasuyuki
    Yanagisawa, Yukio
    Yamasaki, Akihiro
    CHEMICAL ENGINEERING COMMUNICATIONS, 2017, 204 (01) : 79 - 85
  • [38] THE IMPACT OF SELECTOR OPERATION ON ACTIVATED-SLUDGE SETTLEABILITY AND NITRIFICATION - PILOT-SCALE RESULTS
    LINNE, SR
    CHIESA, SC
    RIETH, MG
    POLTA, RC
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1989, 61 (01): : 66 - 72
  • [39] Pilot-scale study of phosphorus recovery through struvite crystallization - II: Applying in-reactor supersaturation ratio as a process control parameter
    Adnan, A
    Koch, FA
    Mavinic, DS
    JOURNAL OF ENVIRONMENTAL ENGINEERING AND SCIENCE, 2003, 2 (06) : 473 - 483
  • [40] Pilot-Scale Airlift Bioreactor with Function-Enhanced Microbes for the Reduction of Refinery Excess Sludge
    Mu, Hongyan
    Zhang, Min
    Sun, Shanshan
    Song, Zhaozheng
    Luo, Yijing
    Zhang, Zhongzhi
    Jiang, Qingzhe
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2021, 18 (13)