Study on start-up characteristics of passive containment cooling system for underground nuclear power plant

被引:0
|
作者
Science and Technology on Reactor System Design Technology Laboratory, Nuclear Power Institute of China, Chengdu [1 ]
610213, China
不详 [2 ]
430010, China
机构
来源
Hedongli Gongcheng | / 4卷 / 121-124期
关键词
D O I
10.13832/j.jnpe.2016.04.0121
中图分类号
学科分类号
摘要
3
引用
收藏
相关论文
共 50 条
  • [41] Modeling and investigation start-up procedures of a combined cycle power plant
    Alobaid, Falah
    Postler, Ralf
    Stroehle, Jochen
    Epple, Bernd
    Kim Hyun-Gee
    [J]. APPLIED ENERGY, 2008, 85 (12) : 1173 - 1189
  • [42] Adaptive-edge search for power plant start-up scheduling
    Kamiya, A
    Kawai, K
    Ono, I
    Kobayashi, S
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 1999, 29 (04): : 518 - 530
  • [43] Emergency generator start-up study for a nuclear generation facility
    Dai, JJ
    Xiao, D
    Shakooh, F
    Scheaffer, C
    Benge, A
    [J]. 2002 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE, CONFERENCE RECORD, 2002, : 50 - 58
  • [44] Experimental study on transient characteristic of passive containment cooling system
    Cheng Cheng
    Wen Qing-long
    Wu Xiao-hang
    Li Yu
    Ju Peng
    [J]. INTERNATIONAL YOUTH NUCLEAR CONGRESS 2016, IYNC2016, 2017, 127 : 193 - 200
  • [45] Modeling and simulation of the start-up process of a high-pressure feed water heater in a nuclear power plant
    Zhang, Zhijiang
    Tian, Zhaofei
    [J]. Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2023, 44 (12): : 2087 - 2094
  • [46] Simulation study on the transient operating characteristics of equal height difference passive containment cooling system
    Zhao, Quanbin
    Tian, Yulin
    Hui, Kai
    Wang, Xingyun
    Chong, Daotong
    Wang, Jinshi
    [J]. ANNALS OF NUCLEAR ENERGY, 2024, 209
  • [47] Comparative efficacy of ways of long-term usage of start-up boilers in the scheme of nuclear power plant
    Khroustalev, V. A.
    Simonyan, A. A.
    [J]. INTERNATIONAL CONFERENCE PROBLEMS OF THERMAL PHYSICS AND POWER ENGINEERING (PTPPE-2017), 2017, 891
  • [48] ASPECTS OF THE CONCEPT OF START-UP AND TECHNOLOGICAL TESTING OF THE UNITS OF THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO LEUSCHNER
    HARTUNG, K
    [J]. KERNENERGIE, 1980, 23 (06): : 209 - 213
  • [49] Investigation of low power start-up characteristics of a loop heat pipe
    Kaya, T
    Ku, JT
    Hoang, TT
    Cheung, MK
    [J]. SPACE TECHNOLOGY AND APPLICATIONS INTERNATIONAL FORUM - 1999, PTS ONE AND TWO, 1999, 458 : 799 - 804
  • [50] PHYSICAL START-UP OF REACTOR OF BRUNO LEUSCHNER NUCLEAR-POWER PLANT 1ST UNIT
    LOTH, KH
    [J]. KERNENERGIE, 1976, 19 (04): : 107 - 112