Organizational effectiveness evaluation model for construction projects based on fuzzy-analytic hierarchy processes

被引:0
|
作者
Yuan, Shangnan [1 ]
Qiang, Maoshan [1 ]
Wen, Qi [1 ]
Jiang, Hanchen [1 ]
机构
[1] State Key Laboratory of Hydroscience and Engineering, Project Management and Technology Institute, Tsinghua University, Beijing,100084, China
关键词
Analytic hierarchy process;
D O I
暂无
中图分类号
学科分类号
摘要
Effective management of construction projects needs scientific methods to evaluate the organizational effectiveness. The interaction mechanism among organization elements of a construction project is used to evaluate the organizational effectiveness of construction projects (OECP). The effectiveness is divided into the organization goals, internal processes, resources and capabilities, organizational people and external stakeholders. Indicator weights are calculated by a fuzzy-analytic hierarchy process (F-AHP) while the indicators used by the hierarchical data and the OECP are evaluated by a synthesized evaluation value. This model is used to evaluate the organizational effectiveness of 8 sub-projects of a large hydropower project. The results show that: 1) the OECP factor weights are similar, with the organization staff being most important, 2) the model is able to analyze the results of a concern factor leading to targeted improvement of the management to improve the OECP, and 3) the synthetic evaluation has a high, significant correlation with the direct evaluation value. The quantitative ordering and qualitative interviews are consistent, which verifies the model's validity. ©, 2015, Press of Tsinghua University. All right reserved.
引用
下载
收藏
页码:616 / 623
相关论文
共 50 条
  • [1] Enhanced fuzzy-analytic hierarchy process
    Satish Tyagi
    Terrence Chambers
    Kai Yang
    Soft Computing, 2018, 22 : 4431 - 4443
  • [2] Enhanced fuzzy-analytic hierarchy process
    Tyagi, Satish
    Chambers, Terrence
    Yang, Kai
    SOFT COMPUTING, 2018, 22 (13) : 4431 - 4443
  • [3] Flood prioritization integrating picture fuzzy-analytic hierarchy and fuzzy-linear assignment model
    Ali Reza Ilderomi
    Matej Vojtek
    Jana Vojteková
    Quoc Bao Pham
    Alban Kuriqi
    Mehdi Sepehri
    Arabian Journal of Geosciences, 2022, 15 (13)
  • [4] Customizing intelligent recommendation study with multiple advisors based on hierarchy structured fuzzy-analytic hierarchy process
    Wan Park, Seong
    Mesicek, Libor
    Shin, Joohyun
    Bae, Kitae
    An, Kyungjin
    Ko, Hoon
    CONCURRENCY AND COMPUTATION-PRACTICE & EXPERIENCE, 2021, 33 (23):
  • [5] Evaluation of Communication Command Effectiveness Based on Fuzzy Analytic Hierarchy Process
    Cao Weixi
    Zhu Jisheng
    Ren Xuejun
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS RESEARCH AND MECHATRONICS ENGINEERING, 2015, 121 : 2099 - 2106
  • [6] New forest fire assessment model based on artificial neural network and analytic hierarchy process or fuzzy-analytic hierarchy process methodology for fire vulnerability map
    Tahri, Meryem
    Badr, Sanaa
    Mohammadi, Zohreh
    Kašpar, Jan
    Berčák, Roman
    Holuša, Jaroslav
    Surový, Peter
    Marušák, Róbert
    Yousfi, Noura
    Engineering Applications of Artificial Intelligence, 2024, 138
  • [7] The research of evaluation of construction enterprise performance based on fuzzy analytic hierarchy process
    Wang, YW
    Hou, XP
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 9 - 11
  • [8] Application of the analytic hierarchy process based on fuzzy simulation in the evaluation of venture investment projects
    Zhao, Zhen-wu
    Tang, Wan-sheng
    International Conference on Management Innovation, Vols 1 and 2, 2007, : 1147 - 1150
  • [9] Operation Risk Assessment of Urban Dense Cable Passageway Based on Fuzzy-Analytic Hierarchy Process
    Nie, Yongjie
    Chen, Daoyuan
    Zheng, Shuai
    Xu, Xiaowei
    Wang, Xilian
    Wu, Zhensheng
    Applied Sciences (Switzerland), 2024, 14 (24):
  • [10] An analytic hierarchy process based model for risk and opportunity assessment of international construction projects
    Dikmen, I
    Birgonul, MT
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2006, 33 (01) : 58 - 68