Study on allocation of unit start-up costs under power market environment

被引:0
|
作者
Hu, Zhaoyang [1 ]
Gan, Deqiang [1 ]
Han, Zhenxiang [1 ]
Chattopadhyay, Deb [2 ]
机构
[1] Zhejiang Univ., Hangzhou 310027, China
[2] Charles River Assoc. (Asia Pacific), Wellington, New Zealand
关键词
Convex game - Cost allocation - Nucleolus value - Shapley value - Unit commitment;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1 / 6
相关论文
共 50 条
  • [21] START-UP COSTS OF MANUFACTURING AND MARKETING SUBS
    不详
    JOURNAL OF TAXATION, 1991, 74 (03): : 196 - 196
  • [22] Taxes, start-up costs, and innovative entrepreneurship
    Darnihamedani, Pourya
    Block, Joern Hendrich
    Hessels, Jolanda
    Simonyan, Aram
    SMALL BUSINESS ECONOMICS, 2018, 51 (02) : 355 - 369
  • [23] DEDUCTIBILITY OF START-UP COSTS FOR DISTANT BRANCHES
    不详
    JOURNAL OF TAXATION, 1984, 61 (03): : 200 - 200
  • [24] Considering Start-Up Costs and Risk Premia in a Power Generation Cost Model
    Mirbach, T.
    Schuetze, T.
    2009 IEEE BUCHAREST POWERTECH, VOLS 1-5, 2009, : 2244 - 2249
  • [25] Study on start-up characteristics of loop heat pipe under low-power
    Wang, Shuangfeng
    Zhang, Weibao
    Zhang, Xianfeng
    Chen, Jinjian
    INTERNATIONAL JOURNAL OF HEAT AND MASS TRANSFER, 2011, 54 (04) : 1002 - 1007
  • [26] POWER GENERATING UNITS START-UP PROCESS ASSESSMENT WITH THE RESPECT TO OPERATION COSTS
    Kosman, Gerard
    RYNEK ENERGII, 2008, (06): : 27 - 33
  • [27] Updating controls improves unit start-up
    Zwers, J
    POWER ENGINEERING, 2004, 108 (04) : 46 - +
  • [28] START-UP TESTING FOR TRACTION POWER
    KUKREJA, LD
    EC&M-ELECTRICAL CONSTRUCTION AND MAINTENANCE, 1985, 84 (01): : 80 - 84
  • [29] Updating controls improves unit start-up
    Zwers, Joe
    Power Engineering (Barrington, Illinois), 2004, 108 (04): : 46 - 48
  • [30] START-UP NEXCOM ENTERS FLASH MARKET
    LEVY, M
    EDN, 1995, 40 (25) : 28 - 28