Research on settlement control effect of CFG pile-raft structure based on field test of High-speed Railway

被引:0
|
作者
Li, Bo [1 ]
Leng, Jing-Yan [1 ]
机构
[1] The Third Railway Survey and Design Institute Group Corporation, Tianjin 300251, China
关键词
Pile foundations - Railroad transportation - Railroads - Piles;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: Field tests were conducted at a CFG pile-raft structure working point of Beijing-Shanghai High-speed Railway to investigate the deformation law of reinforced zone and substratum compression and total settlement. A further evaluation was made to investigate the settlement control effect of deep foundation treatment with CFG pile-raft structure. Research conclusions: The result indicates that: (1) The settlement of CFG pile-raft structure meets standard requirements. (2) The substratum settlement is the main part of total settlement, which accounts for 74% of total settlement. (3) The foundation settlement control effect of CFG pile-raft structure is better than that of CFG pile-cap-net. Under current test conditions, the ratio of the former's total settlement to the latter's is 73.5~75%. (4) The analysis showed that, CFG pile-raft structure can be used in preference in unballasted track on soft soil subgrade.
引用
收藏
页码:48 / 52
相关论文
共 50 条
  • [21] Analysis of vibration mitigation for CFG pile-supported subgrade of high-speed railway
    Zhang, Jiyan
    Gao, Guangyun
    Bi, Junwei
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2023, 164
  • [22] Study on Settlement Prediction Model of High-Speed Railway Bridge Pile Foundation
    Hu, Zhong-Bo
    Ma, Jian-Lin
    Zhou, Jun
    Su, Chun-Hui
    JOURNAL OF APPLIED SCIENCE AND ENGINEERING, 2015, 18 (02): : 187 - 193
  • [23] Engineering practice and research on the high speed railway composite foundation with CFG pile+compaction pile
    Xu, Xing-Wang, 1600, Editorial Department of Journal of Railway Engineering Society, China (33):
  • [24] Studies on the residual settlement of CFG pile composite foundation of the Wuhan-Guangzhou high speed railway
    Zhang, Feng
    Xu, Zhaoyi
    Li, Zhiyi
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 1590 - 1595
  • [25] Field test research of pile-plank structure on Zhengzhou-Xi'an high-speed railD
    Wang, Xun
    Su, Qian
    Xiao, Hong
    PROGRESS IN POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2012, 354-355 : 109 - +
  • [26] Experimental and Numerical Study of the Dynamic Response of XCC Pile-Raft Foundation under High-Speed Train Loads
    Fu, Qiang
    Yuan, Jie
    APPLIED SCIENCES-BASEL, 2021, 11 (19):
  • [27] An Analysis on Failure Pattern of CFG Pile-net Composite Foundation of High-speed Railway
    Jiang Danping
    Wang Binglong
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1357 - 1362
  • [28] Investigation on vibration mitigation performance of CFG pile-reinforced subgrade for high-speed railway
    Gao G.
    Zhang J.
    Bi J.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2023, 54 (06): : 2209 - 2219
  • [29] Long-term settlement prediction of high-speed railway bridge pile foundation
    杨奇
    冷伍明
    张升
    聂如松
    魏丽敏
    赵春彦
    刘维正
    Journal of Central South University, 2014, 21 (06) : 2415 - 2424
  • [30] Long-term settlement prediction of high-speed railway bridge pile foundation
    Qi Yang
    Wu-ming Leng
    Sheng Zhang
    Ru-song Nie
    Li-min Wei
    Chun-yan Zhao
    Wei-zheng Liu
    Journal of Central South University, 2014, 21 : 2415 - 2424