共 50 条
- [1] In-situ test on settlement of CFG pile-raft composite foundation in high-speed railway Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2010, 40 (03): : 570 - 574
- [2] Analytical Solution and Consolidation Features of CFG Pile-Raft Composite Foundation for High-Speed Railway Zhongguo Tiedao Kexue/China Railway Science, 2021, 42 (01): : 1 - 8
- [3] Experimental effect contrast between PHC and CFG pile-raft composite foundation in high speed railway base treatment Shen, Yupeng (ypshen@bjtu.edu.cn), 1600, Academia Sinica (33): : 4174 - 4180
- [4] Consolidation characteristics and influencing factors of rigid pile-raft foundation of high-speed railway Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (07): : 1588 - 1597
- [5] Analysis of rigid pile-raft composite foundation long-term deformation characteristic and control post-construction settlement of high-speed railway 1600, CAFET INNOVA Technical Society, 1-2-18/103, Mohini Mansion, Gagan Mahal Road,, Domalguda, Hyderabad, 500029, India (07):
- [6] DISCUSSION ON CALCULATION THEORIES AND PARAMETERS INFLUENCE ANALYSIS OF PILE-RAFT FOUNDATION IN HIGH-SPEED RAILWAY SUBGRADE NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 408 - +
- [7] Experimental study on subsidence reduction by grouting for pile-raft composite foundation of service high-speed railway Xu, Q. (xuqwtju@126.com), 1600, Chinese Society of Civil Engineering (46):
- [8] DISCUSSING ON SETTLEMENT CALCULATION PROBLEM OF CFG PILE COMPOSITE FOUNDATION IN HIGH-SPEED RAILWAY STATION NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 403 - 407
- [9] NUMERICAL ANALYSIS AND TEST IN FIELD OF FLEXIBLE. LOAD TEST OF THE CFG PILE COMPOSITE FOUNDATION OF HIGH-SPEED RAILWAY INNOVATION & SUSTAINABILITY OF MODERN RAILWAY PROCEEDINGS OF ISMR' 2008, 2008, : 325 - 330
- [10] STUDY ON THE INFLUENCE ON DEWATERING INDUCED SETTLEMENT OF CFG PILE COMPOSITE FOUNDATION IN HIGH-SPEED RAILWAY STATION NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 501 - 504