Spillway design and construction innovation

被引:0
|
作者
Speirs K.M. [1 ]
机构
[1] Mott MacDonald Bentley Ltd, Leeds
关键词
Concrete structures; Health & safety; Strength & testing of materials;
D O I
10.1680/jdare.16.00022
中图分类号
学科分类号
摘要
Mott MacDonald Bentley Ltd (MMB) has carried out modification works to an impounding reservoir in Yorkshire, to enable the overflow system to safely pass the probable maximum flood (PMF) and maintain compliance with the Reservoirs Act 1975. The works, included lining the existing spillway and stilling basin with reinforced concrete. This logistically complex £1·8 million scheme is a key example of MMB’s use of off-site construction and application of innovation to overcome significant challenges that reservoir sites can present. The reservoir has a very steep spillway, which presented MMB with a limited number of options in terms of accessing the spillway and safely constructing the proposed, ensuring a high-quality finished product. With a well-developed track record of precast concrete (PCC) construction on reservoir projects, the MMB team were inspired to push the boundaries of current design and construction methodologies. They developed a PCC ‘U-section’ product to line the spillway, installed via a unique rail and winch system. This paper describes the design and construction of the U-sections and associated installation system, including testing of the joint system to prove hydraulic performance. This design resulted in increased speed of construction, reduced costs and zero injuries on site. © ICE Publishing.
引用
收藏
页码:32 / 40
页数:8
相关论文
共 50 条
  • [21] Spillway capacity upgrade at Malarce dam: Construction of an additional piano key weir spillway
    Pinchard, T.
    Farges, J. -L.
    Boutet, J. -M.
    Lochu, A.
    Laugier, F.
    LABYRINTH AND PIANO KEY WEIRS II - PKW 2013, 2014, : 243 - 252
  • [22] Virtual design and construction: innovation process and diffusion in Finnish construction business
    Matinaro, Ville
    Liu, Yang
    INTERNATIONAL JOURNAL OF INNOVATION AND LEARNING, 2015, 18 (02) : 133 - 150
  • [23] SHOTCRETE REDUCES COST OF SPILLWAY CREST CONSTRUCTION
    SCHRADER, E
    CONCRETE CONSTRUCTION, 1984, 29 (07): : 633 - &
  • [24] Design and construction of the Barriga Dam spillway through an improved wedge-shaped block technology
    Moran, Rafael
    Toledo, Miguel A.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2014, 41 (10) : 924 - 927
  • [25] Mass Timber Construction, Wood Innovation and Design Centre
    Hooper, Emily
    ARCHITECT, 2015, 104 (12): : 68 - 69
  • [26] On Construction of the Teaching System about the Innovation Design Talents
    Jiang Jinsan
    Zhao Xiao
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON EDUCATION MANAGEMENT AND ENGINEERING, 2009, : 1162 - 1166
  • [28] Design and Innovation of Online Course Construction in Chinese Universities
    Yang, Liang-Tao
    2019 4TH INTERNATIONAL CONFERENCE ON EDUCATION SCIENCE AND DEVELOPMENT (ICESD 2019), 2019,
  • [29] DESIGN INNOVATION REDUCES CLARIFIER SIZE AND CONSTRUCTION COSTS
    VANLAMMERS, R
    WATER & SEWAGE WORKS, 1978, 125 (09) : 91 - 92
  • [30] Public Procurement of Innovation in Construction: A Design Science Approach
    Lenderink, B.
    Halman, J. I. M.
    Voordijk, J. T.
    2016 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY (ICMIT), 2016, : 255 - 259