Spillway design and construction innovation

被引:0
|
作者
Speirs K.M. [1 ]
机构
[1] Mott MacDonald Bentley Ltd, Leeds
关键词
Concrete structures; Health & safety; Strength & testing of materials;
D O I
10.1680/jdare.16.00022
中图分类号
学科分类号
摘要
Mott MacDonald Bentley Ltd (MMB) has carried out modification works to an impounding reservoir in Yorkshire, to enable the overflow system to safely pass the probable maximum flood (PMF) and maintain compliance with the Reservoirs Act 1975. The works, included lining the existing spillway and stilling basin with reinforced concrete. This logistically complex £1·8 million scheme is a key example of MMB’s use of off-site construction and application of innovation to overcome significant challenges that reservoir sites can present. The reservoir has a very steep spillway, which presented MMB with a limited number of options in terms of accessing the spillway and safely constructing the proposed, ensuring a high-quality finished product. With a well-developed track record of precast concrete (PCC) construction on reservoir projects, the MMB team were inspired to push the boundaries of current design and construction methodologies. They developed a PCC ‘U-section’ product to line the spillway, installed via a unique rail and winch system. This paper describes the design and construction of the U-sections and associated installation system, including testing of the joint system to prove hydraulic performance. This design resulted in increased speed of construction, reduced costs and zero injuries on site. © ICE Publishing.
引用
收藏
页码:32 / 40
页数:8
相关论文
共 50 条
  • [1] Ashton stepped spillway - Design and construction
    Nigus, LA
    Steiger, KM
    Marti, C
    HYDRAULICS OF STEPPED SPILLWAYS, 2000, : 35 - 41
  • [2] Sam Rayburn Dam and reservoir labyrinth spillway design and construction
    Wise, JR
    ASSOCIATION OF STATE DAM SAFETY OFFICIALS 1998 ANNUAL CONFERENCE PROCEEDINGS, 1998, : 411 - 420
  • [3] Innovation in ship design and construction
    Anon
    Welding Review International, 1995, 14 (04):
  • [4] Design and construction of the first Piano Key Weir spillway at Goulours dam
    Laugier, F.
    International Journal on Hydropower and Dams, 2007, 14 (05): : 94 - 100
  • [5] BEARSPAW DEVELOPMENT - DESIGN AND CONSTRUCTION OF A SIDE-CHANNEL OVERFLOW SPILLWAY
    PILDYSH, M
    SLOPEK, RJ
    NUNN, JOH
    KEYS, RA
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1990, 17 (03) : 423 - 430
  • [6] Construction of the Opinaka Spillway.
    Massiera, Michel
    Pelchat, Claude
    1600, (13):
  • [7] DESIGN OF SPILLWAY CRESTS
    REESE, AJ
    MAYNORD, ST
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1987, 113 (04): : 476 - 490
  • [8] Managing for increased design and construction innovation
    Tatum, C.B.
    Journal of Management in Engineering, 1989, 5 (04): : 385 - 399
  • [9] Spillway construction at the Irganai HPP in Dagestan
    Umanskii R.Z.
    Balychevtsev I.A.
    Dzherin V.K.
    Krivko S.A.
    Skoblikov V.V.
    Shevchuk A.P.
    Power Technology and Engineering, 2008, 42 (4) : 191 - 195
  • [10] Design guidelines for spillway gates
    Sehgal, CK
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1996, 122 (03): : 155 - 165