Hybrid building energy modeling method with parameterized prototype models and rapid calibration

被引:0
|
作者
Li, Guangchen [1 ]
Yang, Jingjing [1 ]
Guo, Jiapeng [2 ]
Wang, Zhiyuan [1 ]
Deng, Zhang [3 ]
Chen, Jianli [4 ]
Chen, Yixing [1 ,5 ]
机构
[1] Hunan Univ, Coll Civil Engn, Changsha 410082, Hunan, Peoples R China
[2] Minnan Univ Sci & Technol, Coll Intelligent Construct Engn, Quanzhou 362242, Fujian, Peoples R China
[3] Hunan Univ Sci & Technol, Sch Civil Engn, Xiangtan 411201, Hunan, Peoples R China
[4] Tongji Univ, Coll Civil Engn, Shanghai 200092, Peoples R China
[5] Hunan Univ, Minist Educ, Key Lab Bldg Safety & Energy Efficiency, Changsha, Hunan, Peoples R China
关键词
Building energy model; Monte Carlo; Demand response; AutoBPS; Rapid calibration; UNCERTAINTY ANALYSIS; SIMULATION;
D O I
10.1016/j.enbuild.2024.114948
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Building energy models were widely used in building energy performance analysis and efficiency improvement, such as building demand response assessment and energy system optimization. However, building energy modeling was a time-consuming and complex process. Therefore, this paper proposed a hybrid building energy modeling method based on parameterized prototype models and rapid calibration. The main feature of the method was the rapid generation of target building energy models using the prototype building energy performance database. The parameterized prototype building energy model considered 13 uncertainty parameters. Based on the range of 13 uncertainty parameters, such as wall U-value and solar heat gain coefficient, 1000 simulations were performed by Monte Carlo sampling to generate the prototype building energy performance database. The target building energy model was quickly calibrated by learning from this database. It filtered the models that met the requirements based on the actual building measurement data. Based on this hybrid modeling method, the rapid modeling tool AutoBPS-Hybrid was developed in a ruby environment. Shopping mall buildings located in three different climate zones were selected as case studies for this study. The results showed that if only one building energy model meeting the percentage errors was needed, only 3-4 simulations were required. If it was necessary to match the real uncertainty parameter distributions, an average of about 53 simulations was needed. The building energy models were applied to plug load and lighting control in buildings. The shopping mall buildings in Harbin, Beijing and Chengdu could reduce energy consumption by 10.18-13.33 kWh/m2, 14.43-18.15 kWh/m2 and 11.54-14.69 kWh/m2 per year, respectively.
引用
收藏
页数:23
相关论文
共 50 条
  • [31] Calibration of building energy simulation models based on optimization: a case study
    Monetti, Valentina
    Davin, Elisabeth
    Fabrizio, Enrico
    Andre, Philippe
    Filippi, Marco
    6TH INTERNATIONAL BUILDING PHYSICS CONFERENCE (IBPC 2015), 2015, 78 : 2971 - 2976
  • [32] A building energy models calibration methodology based on inverse modelling approach
    Gutierrez Gonzalez, Vicente
    Fernandez Bandera, Carlos
    BUILDING SIMULATION, 2022, 15 (11) : 1883 - 1898
  • [33] Building Energy Models in the Operational Phase: Automation of the Model Calibration Process
    Conaghan, Catherine
    Earle, Stephen
    Rawte, Rohan
    Baliga, Veda
    SMART AND HEALTHY WITHIN THE TWO-DEGREE LIMIT (PLEA 2018), VOL 1, 2018, : 104 - 109
  • [34] A Meta Model Based Bayesian Approach for Building Energy Models Calibration
    Yuan, Jun
    Nian, Victor
    Su, Bin
    LEVERAGING ENERGY TECHNOLOGIES AND POLICY OPTIONS FOR LOW CARBON CITIES, 2017, 143 : 161 - 166
  • [35] Evaluating different levels of information on the calibration of building energy simulation models
    Cheng, Siyu
    Tekler, Zeynep Duygu
    Jia, Hongyuan
    Li, Wenxin
    Chong, Adrian
    BUILDING SIMULATION, 2024, 17 (04) : 657 - 676
  • [36] A building energy models calibration methodology based on inverse modelling approach
    Vicente Gutiérrez González
    Carlos Fernández Bandera
    Building Simulation, 2022, 15 : 1883 - 1898
  • [37] Influence of data acquisition on the Bayesian calibration of urban building energy models
    Risch, Stanley
    Remmen, Peter
    Mueller, Dirk
    ENERGY AND BUILDINGS, 2021, 230
  • [38] Discussing for a rapid & flexible casting design method based on modeling, simulation and rapid prototype machine
    Su, Zicheng
    Wang, Chuanyang
    ADVANCED MATERIALS AND PROCESS TECHNOLOGY, PTS 1-3, 2012, 217-219 : 2142 - 2147
  • [39] ANFIS Parallel Hybrid Modeling Method for Optical Encoder Calibration
    Wang Yanyong
    Deng Fang
    Sun Jian
    Xu Lishuan
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 1591 - 1596
  • [40] A systematic method to develop three dimensional geometry models of buildings for urban building energy modeling
    Wang, Chao
    Wei, Shen
    Du, Sihong
    Zhuang, Dian
    Li, Yanxia
    Shi, Xing
    Jin, Xing
    Zhou, Xin
    SUSTAINABLE CITIES AND SOCIETY, 2021, 71 (71)