Tonic Emballage hits more hold-ups with PMs

被引:0
|
作者
Anon
机构
来源
PPI This Week | 2005年 / 20卷 / 25期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Tonic Emballage has hit further delays with plans to install two paper machines at its plant in Bou-Ismail. The setback follows more hold-ups with construction of the PM houses. The company hopes to complete the buildings by August 1, 2005. The delay has also affected the installation of a second-hand containerboard machine. Metso Paper is rebuilding the 300 tonne/day schrenz PM to enable it to produce 400 tonnes/day of recycled fluting, testliner and white-top testliner in the 105-180 g/m2.
引用
收藏
相关论文
共 46 条