Mixed integer programming for dynamic tower crane and storage area optimization on construction sites

被引:0
|
作者
Riga, Katrin [1 ]
Jahr, Katrin [2 ]
Thielen, Clemens [3 ]
Borrmann, André [2 ]
机构
[1] Riga, Katrin
[2] Jahr, Katrin
[3] Thielen, Clemens
[4] Borrmann, André
来源
Jahr, Katrin (katrin.jahr@tum.de) | 1600年 / Elsevier B.V., Netherlands卷 / 120期
关键词
Integer programming - Towers - Construction equipment - Transportation routes - Tower cranes;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Entry Optimization using Mixed Integer Linear Programming
    Baek, Seungmin
    Moon, Sungwon
    Kim, H. Jin
    INTERNATIONAL JOURNAL OF CONTROL AUTOMATION AND SYSTEMS, 2016, 14 (01) : 282 - 290
  • [32] Global methods for dynamic optimization and mixed-integer dynamic optimization
    Chachuat, Benoit
    Singer, Adam B.
    Barton, Paul I.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2006, 45 (25) : 8373 - 8392
  • [33] Optimal Control of Induced Draft Cooling Tower using Mixed Integer Programming
    Ghawash, Faiq
    Hovd, Morten
    Schofield, Brad
    5TH IEEE CONFERENCE ON CONTROL TECHNOLOGY AND APPLICATIONS (IEEE CCTA 2021), 2021, : 214 - 219
  • [34] Global mixed-integer dynamic optimization
    Chachuat, B
    Singer, AB
    Barton, PI
    AICHE JOURNAL, 2005, 51 (08) : 2235 - 2253
  • [35] Efficient Storage of Pareto Points in Biobjective Mixed Integer Programming
    Adelgren, Nathan
    Belotti, Pietro
    Gupte, Akshay
    INFORMS JOURNAL ON COMPUTING, 2018, 30 (02) : 324 - 338
  • [36] Dispatching rule design for tower crane scheduling in prefabricated construction via genetic programming
    Yin, Jing
    Wang, Huanhuan
    Li, Jiahao
    Zhang, Zhitian
    Cai, Shunyao
    Liu, Wenjun
    AUTOMATION IN CONSTRUCTION, 2024, 165
  • [37] Area aggregation in map generalisation by mixed-integer programming
    Haunert, Jan-Henrik
    Wolff, Alexander
    INTERNATIONAL JOURNAL OF GEOGRAPHICAL INFORMATION SCIENCE, 2010, 24 (12) : 1871 - 1897
  • [38] Mixed-Integer Linear Programming on Work-Rest Schedule Design for Construction Sites in Hot Weather
    Yi, Wen
    Wang, Shuaian
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2017, 32 (05) : 429 - 439
  • [39] Integrating 3D visualization and simulation for tower crane operations on construction sites
    Al-Hussein, Mohamed
    Niaz, Muhammad Athar
    Yu, Haitao
    Kim, Hyoungkwan
    AUTOMATION IN CONSTRUCTION, 2006, 15 (05) : 554 - 562
  • [40] Cut Scheduling Optimization in Plate Mill Finishing Area Through Mixed-Integer Linear Programming
    Aurora, Claudio
    Cettolo, Doretta
    Cuzzola, Francesco Alessandro
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2010, 18 (01) : 118 - 127