共 50 条
- [42] DEVELOPMENT OF THE SUBSEA COMPLETION SYSTEM FOR THE HIGHLANDER FIELD JOURNAL OF PETROLEUM TECHNOLOGY, 1986, 38 (04): : 453 - 460
- [43] DEVELOPMENT OF SUBSEA OIL PRODUCTION SYSTEM. R and D: Research and Development Kobe Steel Engineering Reports, 1986, 36 (02): : 65 - 67
- [44] Universal buoy system supporting subsea production OCEANS 2002 MTS/IEEE CONFERENCE & EXHIBITION, VOLS 1-4, CONFERENCE PROCEEDINGS, 2002, : 441 - 451
- [45] FEASIBILITY STUDY OF A SUBSEA TO SHORE PRODUCTION SYSTEM PROCEEDINGS OF THE ASME 35TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING , 2016, VOL 8, 2016,
- [46] Research identifies designs for lowering subsea production cost Oil and Gas Journal, 1993, 91 (10): : 45 - 48
- [48] Design Subsea Trees Hydraulic Control System INTERNATIONAL CONFERENCE ON CONTROL SYSTEM AND AUTOMATION (CSA 2013), 2013, : 150 - 155
- [49] WET CONNECTION SYSTEM OF PIPELINE BUNDLE - SUBSEA PRODUCTION SYSTEM -. Nippon Steel Technical Report, 1988, (36): : 15 - 24