Causes of construction delay: Traditional contracts

被引:0
|
作者
Odeh, A.M. [1 ]
Battaineh, H.T. [1 ]
机构
[1] Jordan University of Sci. and Tech., PO Box 3030, Irbid 22110, Jordan
关键词
D O I
10.1016/S0263-7863(00)00037-5
中图分类号
学科分类号
摘要
Project management
引用
收藏
页码:67 / 73
相关论文
共 50 条
  • [41] An analysis of causes of delay and cost overrun in construction of hydropower project
    Azam, Tamoor
    Jiang, Wang Song
    Malik, Sohail Ahmed
    Malik, Saqib Yaqoob
    Nilofar, Memoona
    Abbas, Zaheer
    Ullah, Ihsan
    JOURNAL OF PUBLIC AFFAIRS, 2022, 22 (03)
  • [42] Risk matrix for delay causes in building construction projects in KSA
    Alfraidi, Yahya Nasser
    INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2018, 5 (06): : 93 - 97
  • [43] CONSTRUCTION CONTRACTS
    FARRAR, D
    CHEMICAL ENGINEER-LONDON, 1995, (590): : 10 - 10
  • [44] Construction & contracts
    不详
    POWER ENGINEERING, 2007, 111 (11) : 44 - +
  • [45] Construction and contracts
    不详
    POWER ENGINEERING, 2004, 108 (03) : 16 - 16
  • [46] Construction & contracts
    不详
    POWER ENGINEERING, 2004, 108 (05) : 22 - 22
  • [47] Construction and contracts
    不详
    POWER ENGINEERING, 2002, 106 (03) : 25 - 25
  • [48] Construction and contracts
    不详
    POWER ENGINEERING, 2002, 106 (08) : 14 - 14
  • [49] Construction & contracts
    不详
    POWER ENGINEERING, 2005, 109 (04) : 10 - 10
  • [50] Construction and contracts
    不详
    POWER ENGINEERING, 2001, 105 (11) : 50 - +