首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
Causes of construction delay: Traditional contracts
被引:0
|
作者
:
Odeh, A.M.
论文数:
0
引用数:
0
h-index:
0
机构:
Jordan University of Sci. and Tech., PO Box 3030, Irbid 22110, Jordan
Jordan University of Sci. and Tech., PO Box 3030, Irbid 22110, Jordan
Odeh, A.M.
[
1
]
Battaineh, H.T.
论文数:
0
引用数:
0
h-index:
0
机构:
Jordan University of Sci. and Tech., PO Box 3030, Irbid 22110, Jordan
Jordan University of Sci. and Tech., PO Box 3030, Irbid 22110, Jordan
Battaineh, H.T.
[
1
]
机构
:
[1]
Jordan University of Sci. and Tech., PO Box 3030, Irbid 22110, Jordan
来源
:
International Journal of Project Management
|
2002年
/ 20卷
/ 01期
关键词
:
D O I
:
10.1016/S0263-7863(00)00037-5
中图分类号
:
学科分类号
:
摘要
:
Project management
引用
收藏
页码:67 / 73
相关论文
共 50 条
[41]
An analysis of causes of delay and cost overrun in construction of hydropower project
论文数:
引用数:
h-index:
机构:
Azam, Tamoor
Jiang, Wang Song
论文数:
0
引用数:
0
h-index:
0
机构:
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Jiang, Wang Song
Malik, Sohail Ahmed
论文数:
0
引用数:
0
h-index:
0
机构:
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Malik, Sohail Ahmed
Malik, Saqib Yaqoob
论文数:
0
引用数:
0
h-index:
0
机构:
Northeast Forestry Univ, Coll Econ & Management, Harbin, Peoples R China
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Malik, Saqib Yaqoob
Nilofar, Memoona
论文数:
0
引用数:
0
h-index:
0
机构:
Karakoram Int Univ, Dept Business Adm, Gilgit, Pakistan
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Nilofar, Memoona
Abbas, Zaheer
论文数:
0
引用数:
0
h-index:
0
机构:
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Abbas, Zaheer
Ullah, Ihsan
论文数:
0
引用数:
0
h-index:
0
机构:
Yunnan Univ Nationalities Kunming, Dept Sociol, Kunming, Yunnan, Peoples R China
Kunming Univ Sci & Technol, Sch Management & Econ, Dept Management Sci & Engn, Kunming, Yunnan, Peoples R China
Ullah, Ihsan
JOURNAL OF PUBLIC AFFAIRS,
2022,
22
(03)
[42]
Risk matrix for delay causes in building construction projects in KSA
Alfraidi, Yahya Nasser
论文数:
0
引用数:
0
h-index:
0
机构:
Hail Univ, Architectural Engn Dept, Hail, Saudi Arabia
Hail Univ, Architectural Engn Dept, Hail, Saudi Arabia
Alfraidi, Yahya Nasser
INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES,
2018,
5
(06):
: 93
-
97
[43]
CONSTRUCTION CONTRACTS
FARRAR, D
论文数:
0
引用数:
0
h-index:
0
FARRAR, D
CHEMICAL ENGINEER-LONDON,
1995,
(590):
: 10
-
10
[44]
Construction & contracts
不详
论文数:
0
引用数:
0
h-index:
0
不详
POWER ENGINEERING,
2007,
111
(11)
: 44
-
+
[45]
Construction and contracts
不详
论文数:
0
引用数:
0
h-index:
0
不详
POWER ENGINEERING,
2004,
108
(03)
: 16
-
16
[46]
Construction & contracts
不详
论文数:
0
引用数:
0
h-index:
0
不详
POWER ENGINEERING,
2004,
108
(05)
: 22
-
22
[47]
Construction and contracts
不详
论文数:
0
引用数:
0
h-index:
0
不详
POWER ENGINEERING,
2002,
106
(03)
: 25
-
25
[48]
Construction and contracts
不详
论文数:
0
引用数:
0
h-index:
0
不详
POWER ENGINEERING,
2002,
106
(08)
: 14
-
14
[49]
Construction & contracts
不详
论文数:
0
引用数:
0
h-index:
0
不详
POWER ENGINEERING,
2005,
109
(04)
: 10
-
10
[50]
Construction and contracts
不详
论文数:
0
引用数:
0
h-index:
0
不详
POWER ENGINEERING,
2001,
105
(11)
: 50
-
+
←
1
2
3
4
5
→