共 50 条
- [42] Some Considerations Concerning Pillar Load and Pillar Stability in Post-Pillar Mining Systems BHM Berg- und Huttenmannische Monatshefte, 2013, 158 (04): : 121 - 129
- [43] PILLAR-SPLIT METHOD OF STABILIZING DETERIORATING ROOM-AND-PILLAR OPENINGS CIM BULLETIN, 1985, 78 (875): : 73 - 74
- [47] GEOMECHANICAL SUBSTANTIATION OF PILLAR-AND-ROOM SEQUENCES OF MINING THE PROTECTIVE LAYER SOVIET MINING SCIENCE USSR, 1991, 27 (04): : 269 - 275
- [49] TECHNOLOGY OF EXTENDED PILLAR RECOVERY IN ROOM AND PILLAR MINING IN LEADING COAL PRODUCING COUNTRIES. REVIEW EURASIAN MINING, 2019, (01): : 21 - 24
- [50] AUTOMATION TRENDS IN ROOM-AND-PILLAR CONTINUOUS-MINING SYSTEMS IN THE U. S. A. Journal of The South African Institute of Mining and Metallurgy, 1981, 81 (03): : 57 - 65