Structural performance of post-installed rebar anchor part 2: Anchor performance of post-installed rebar with small plate

被引:0
|
作者
SUGIYAMA T. [1 ]
ONO H. [2 ]
ISOZUMI Y. [3 ]
WATANABE H. [1 ]
机构
[1] Taisei advanced center of technology, Taisei Co.
[2] Nuclear Facilities Division, Taisei Co.
[3] Design Division, Taisei Co.
来源
关键词
Anchor; Bearing; Bond; Post-install system; Rebar; Tension;
D O I
10.3130/AIJS.85.1587
中图分类号
学科分类号
摘要
The purpose of this research is to propose a post-installed headed rebar anchor method with high reliability to using for the installation for new members in R/C building, and to evaluate the structural performance of the method. In this paper, we conducted an experiment with long embedment length. From the experiment, the effects of factors such as the concrete edge distance and the number of anchors for the bond behavior of rebar and the bearing behavior of the small headed plate were clarified, and the evaluation method of structural performance was discussed. © 2020 Architectural Institute of Japan. All rights reserved.
引用
收藏
页码:1587 / 1597
页数:10
相关论文
共 50 条
  • [21] Seismic Performance of Column-Foundation-Joints with Post-installed Rebar Connections: Pre-test Simulations
    Mahadik, Vinay
    Sharma, Akanshu
    Hofmann, Jan
    [J]. HIGH TECH CONCRETE: WHERE TECHNOLOGY AND ENGINEERING MEET, 2018, : 1033 - 1040
  • [22] Experimental study on bond strength of adhesive post-installed rebar systems during fire
    Thuan L.T.
    Owa S.
    Song C.
    Ikeda K.
    [J]. Journal of Structural and Construction Engineering, 2019, 84 (758): : 575 - 582
  • [23] FRACTURE STIMULATION OF THE ADHESIVE POST-INSTALLED ANCHOR APPLIED TO EXISTING CONCRETE STRUCTURES
    Kadono, Takuma
    Okazaki, Shinichiro
    Nakamura, Taro
    Kurumatani, Mao
    [J]. INTERNATIONAL JOURNAL OF GEOMATE, 2022, 22 (92): : 64 - 70
  • [24] Experimental study on bond-slip behavior of post-installed rebar at high temperature
    Liu C.
    Yu J.
    Lu Z.
    Wang K.
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2010, 38 (11): : 1579 - 1585
  • [25] Static and Cyclic Tension Behavior of Post-Installed Rebar after Exposure to High Temperature
    Qun Xie
    Song Xue
    Yongqiang Zhao
    [J]. KSCE Journal of Civil Engineering, 2020, 24 : 1775 - 1786
  • [26] Static and Cyclic Tension Behavior of Post-Installed Rebar after Exposure to High Temperature
    Xie, Qun
    Xue, Song
    Zhao, Yongqiang
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (06) : 1775 - 1786
  • [27] Post-installed anchors in concrete strengthened by post-installed reinforcement under tensile load
    Siamakani, Seyed Yaser Mousavi
    Sahamitmongkol, Raktipong
    [J]. EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2022, 26 (13) : 6563 - 6582
  • [28] Interfacial shear performance of UHPC-strengthened RC structures using post-installed rebar connections: Experiments and analyses
    Sun, Wenbiao
    Fan, Wei
    Yang, Jie
    Zhang, Yang
    Zhong, Zhengwu
    [J]. ENGINEERING STRUCTURES, 2023, 277
  • [29] Residual Strength of Organic Anchorage Adhesive for Post-installed Rebar at Elevated Temperatures and After Heating
    Yu Zhang
    Guo-biao Lou
    Ke-peng Chen
    Guo-qiang Li
    [J]. Fire Technology, 2016, 52 : 877 - 895
  • [30] Residual Strength of Organic Anchorage Adhesive for Post-installed Rebar at Elevated Temperatures and After Heating
    Zhang, Yu
    Lou, Guo-biao
    Chen, Ke-peng
    Li, Guo-qiang
    [J]. FIRE TECHNOLOGY, 2016, 52 (03) : 877 - 895