Operation Performance Verification of Continuous Box Beam in High Speed Railway

被引:0
|
作者
Wang, Wei [1 ]
Meng, Xin [1 ]
Wang, Yigan [1 ]
Zhou, Zheng [1 ]
Wang, Dongmeng [2 ]
机构
[1] China Academy of Railway Sciences Corporation Limited, Beijing,100081, China
[2] China Railway 14th Bureau Group Corporation Limited, Shandong, Jinan,250101, China
关键词
Acceleration - Concrete beams and girders - Parameter estimation - Piers - Prestressed concrete - Railroad bridges - Railroad transportation - Rails;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: The verification technology of operation performance of continuous box beam with common span is sorted out, in order to provide technical guidance for better operation performance verification of continuous box beam with common span of high - speed railway. Based on the data of the dynamic performance test of high - speed railway bridges in China in recent years and the relevant theoretical research, the measured samples of bridge dynamic performance are statistically analyzed, and the recommended ordinary values of the operation performance evaluation parameters of prestressed concrete continuous box beams at the operating speeds of 250 km/h and 350 km/h are given. Research conclusions: (1) The tasks of operation performance verification of three types of continuous box beam with common span of high - speed railway are defined, and 10 main technical parameters for operation performance evaluation of continuous box beam are put forward. (2)The vertical natural frequency is determined by the power function of span, the vertical damping ratio is 0.5% to 2.0% , the ratio of deflection to span is 1/5 500 to 1/3 500 and 1/6 000 to 1/4 000 respectively, the vertical rotation angle at beam end is 0. 60%crad and 0. 50%crad respectively, the dynamic factor is 1.17 to 1.26 and 1.20 to 1. 30 respectively, the vertical and lateral amplitude at midspan of beam is 0.25 to 0.80 mm and 0. 10 to 0.15 mm respectively, the vertical vibration acceleration at midspan of beam is 0.25 to 0.40 m/s , the lateral amplitude at pier top is chosen as the ratio of the height of pier and the lateral average width of the pier in the range of 0.5 to 4.2, the relative lateral displacement of rail support on both sides of adjacent beam end of ballastless track is 0.5 mm. (3) The research results are in line with the actual state of high - speed railway bridges, which can provide support for the revision of bridge operating performance verification specifications. © 2023 Editorial Department of Journal of Railway Engineering Society. All rights reserved.
引用
收藏
页码:47 / 52
相关论文
共 50 条
  • [31] Research on the Peaks of Elevated Box Bridge Structure Noise of High Speed Railway
    Zhang, Xiaoan
    Shi, Guangtian
    Zhang, Xiaoyun
    Yang, Jianjin
    Xu, Lei
    [J]. RAILWAY DEVELOPMENT, OPERATIONS, AND MAINTENANCE: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION 2017 (ICRT 2017), 2018, : 424 - 430
  • [32] Research on Comprehensive Operation Performance Evaluation of China High-Speed Railway Based on the Big Data Platform
    Yang, Qing
    [J]. NEW INDUSTRIALIZATION AND URBANIZATION DEVELOPMENT ANNUAL CONFERENCE: THE INTERNATIONAL FORUM ON NEW INDUSTRIALIZATION DEVELOPMENT IN BIG-DATA ERA, 2015, : 410 - 417
  • [33] Parametric modeling of continuous beam bridges of a high-speed railway based on building information modeling and engineering applications
    He X.
    Wang H.
    Gao H.
    Mao J.
    Lang T.
    Wang F.
    [J]. Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2022, 43 (03): : 313 - 317
  • [34] Research on transverse seismic pounding effect and shear-keygaps of high-speed railway continuous beam bridges
    Yang M.
    Wang C.
    Qiao J.
    [J]. Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2019, 50 (09): : 2252 - 2263
  • [35] High performance concrete requirements for prefabricated high speed railway sleepers
    Bezgin, Niyazi Oezguer
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2017, 138 : 340 - 351
  • [36] Research on the Seismic Performance of Simply Supported Beam Bridge of Near-fault High-speed Railway
    近断层高铁简支梁桥抗震性能分析研究
    [J]. Zeng, Yongping, 1600, Editorial Department of Journal of Railway Engineering Society (37): : 70 - 76
  • [37] HIGH-SPEED OPERATION TECHNOLOGY OF CONTINUOUS ANNEALING LINE
    YAMAGUCHI, Y
    [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S359 - S359
  • [38] Ambient vibration testing and seismic performance of precast I beam bridges on a high-speed railway line
    Toydemir, Burak
    Kocak, Ali
    Sevim, Baris
    Zengin, Basak
    [J]. STEEL AND COMPOSITE STRUCTURES, 2017, 23 (05): : 557 - 570
  • [39] Judgment of train operation conflict and its implementation for high-speed railway
    School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 610031, China
    [J]. Xinan Jiaotong Daxue Xuebao, 2012, 5 (867-873):
  • [40] WHEEL-RAIL VERTICAL FORCES IN HIGH-SPEED RAILWAY OPERATION
    RADFORD, RW
    [J]. JOURNAL OF ENGINEERING FOR INDUSTRY-TRANSACTIONS OF THE ASME, 1977, 99 (04): : 849 - 858