共 50 条
- [1] Dynamic Performance of High Speed Railway Box Girder with Shock Absorber [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, EURODYN 2011, 2011, : 1510 - 1516
- [2] The high speed operation of the main railway [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1904, 48 (26): : 949 - 959
- [3] Safe operation on high speed railway [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 2663 - 2668
- [4] DURABILITY RESEARCH FOR HIGH-PERFORMANCE CONCRETE BOX GIRDER OF HIGH SPEED RAILWAY [J]. PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 1: RAILROAD INFRASTRUCTURE ENGINEERING SAFETY, SECURITY AND ENVIRONMENT, 2010, : 11 - 14
- [5] Dynamic Performance Analysis on High-Speed Railway Continuous Girder Bridge [J]. GREEN BUILDING MATERIALS AND ENERGY-SAVING CONSTRUCTION, 2011, 280 : 186 - 190
- [6] Automatic in-Operation Modal Analysis for the continuous monitoring of high-speed railway bridges [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, EURODYN 2011, 2011, : 1539 - 1545
- [7] Rating techniques research on operation performance of bridge with common span in China high speed railway [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1604 - 1608
- [8] Generation mechanism of train operation conflicts in high speed railway [J]. EEA - Electrotehnica, Electronica, Automatica, 2020, 68 (03): : 41 - 46
- [9] Simulation analysis to the operation of station track on high speed railway [J]. TRAFFIC AND TRANSPORTATION STUDIES, VOLS 1 AND 2, PROCEEDINGS, 2002, : 568 - 573
- [10] Noise Reducing Railway Door System for High Speed Operation [J]. INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND SYSTEMS (ICCAS 2010), 2010, : 763 - 766