Operation Performance Verification of Continuous Box Beam in High Speed Railway

被引:0
|
作者
Wang, Wei [1 ]
Meng, Xin [1 ]
Wang, Yigan [1 ]
Zhou, Zheng [1 ]
Wang, Dongmeng [2 ]
机构
[1] China Academy of Railway Sciences Corporation Limited, Beijing,100081, China
[2] China Railway 14th Bureau Group Corporation Limited, Shandong, Jinan,250101, China
关键词
Box beam - Common Span - Continuous box beam - Evaluation parameters - High-speed railway bridges - High-speed railways - Operation performance - Ordinary value - Performance verification - Performances evaluation;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: The verification technology of operation performance of continuous box beam with common span is sorted out, in order to provide technical guidance for better operation performance verification of continuous box beam with common span of high - speed railway. Based on the data of the dynamic performance test of high - speed railway bridges in China in recent years and the relevant theoretical research, the measured samples of bridge dynamic performance are statistically analyzed, and the recommended ordinary values of the operation performance evaluation parameters of prestressed concrete continuous box beams at the operating speeds of 250 km/h and 350 km/h are given. Research conclusions: (1) The tasks of operation performance verification of three types of continuous box beam with common span of high - speed railway are defined, and 10 main technical parameters for operation performance evaluation of continuous box beam are put forward. (2)The vertical natural frequency is determined by the power function of span, the vertical damping ratio is 0.5% to 2.0% , the ratio of deflection to span is 1/5 500 to 1/3 500 and 1/6 000 to 1/4 000 respectively, the vertical rotation angle at beam end is 0. 60%crad and 0. 50%crad respectively, the dynamic factor is 1.17 to 1.26 and 1.20 to 1. 30 respectively, the vertical and lateral amplitude at midspan of beam is 0.25 to 0.80 mm and 0. 10 to 0.15 mm respectively, the vertical vibration acceleration at midspan of beam is 0.25 to 0.40 m/s , the lateral amplitude at pier top is chosen as the ratio of the height of pier and the lateral average width of the pier in the range of 0.5 to 4.2, the relative lateral displacement of rail support on both sides of adjacent beam end of ballastless track is 0.5 mm. (3) The research results are in line with the actual state of high - speed railway bridges, which can provide support for the revision of bridge operating performance verification specifications. © 2023 Editorial Department of Journal of Railway Engineering Society. All rights reserved.
引用
收藏
页码:47 / 52
相关论文
共 50 条
  • [1] Dynamic Performance of High Speed Railway Box Girder with Shock Absorber
    Gao Ri
    Li Chenggen
    Feng Gangxian
    [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, EURODYN 2011, 2011, : 1510 - 1516
  • [2] The high speed operation of the main railway
    von Borries
    [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1904, 48 (26): : 949 - 959
  • [3] Safe operation on high speed railway
    Nie, L
    Xiao, GP
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 2663 - 2668
  • [4] DURABILITY RESEARCH FOR HIGH-PERFORMANCE CONCRETE BOX GIRDER OF HIGH SPEED RAILWAY
    Lei, Jun-Qing
    Zhong, Xin-Hua
    Wang, Wu-Qin
    [J]. PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 1: RAILROAD INFRASTRUCTURE ENGINEERING SAFETY, SECURITY AND ENVIRONMENT, 2010, : 11 - 14
  • [5] Dynamic Performance Analysis on High-Speed Railway Continuous Girder Bridge
    Song, Shoutan
    Zhang, Jiwen
    Yuan, Xin
    [J]. GREEN BUILDING MATERIALS AND ENERGY-SAVING CONSTRUCTION, 2011, 280 : 186 - 190
  • [6] Automatic in-Operation Modal Analysis for the continuous monitoring of high-speed railway bridges
    Soria, L.
    Peeters, B.
    Van der Auweraer, H.
    [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON STRUCTURAL DYNAMICS, EURODYN 2011, 2011, : 1539 - 1545
  • [7] Rating techniques research on operation performance of bridge with common span in China high speed railway
    Wang, W.
    Yin, J.
    Yang, Y. Q.
    Yao, J. C.
    Dong, Z. S.
    Meng, X.
    Ke, Z. T.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1604 - 1608
  • [8] Generation mechanism of train operation conflicts in high speed railway
    Wang, Tao
    Huang, Kang
    Song, Xiaoli
    Wang, Zhenyi
    [J]. EEA - Electrotehnica, Electronica, Automatica, 2020, 68 (03): : 41 - 46
  • [9] Simulation analysis to the operation of station track on high speed railway
    Nie, L
    Xiao, GP
    Yang, H
    [J]. TRAFFIC AND TRANSPORTATION STUDIES, VOLS 1 AND 2, PROCEEDINGS, 2002, : 568 - 573
  • [10] Noise Reducing Railway Door System for High Speed Operation
    Joung, Eui Jin
    Lee, Han Min
    Kim, Gil Dong
    Hong, Jae Sung
    [J]. INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND SYSTEMS (ICCAS 2010), 2010, : 763 - 766