A bi-level programming approach of period-preferred train operations for high-speed railways

被引:0
|
作者
Huang, Zhipeng [1 ]
Tian, Zhiqiang [1 ]
Si, Xiaoxin [2 ]
机构
[1] School of Traffic and Transportation, Lanzhou Jiaotong University, Lanzhou,730070, China
[2] Lanzhou Railway Station Operation Depot, China Railway Lanzhou Group Co., Ltd., Lanzhou,730050, China
关键词
Railroads - Railroad transportation - Integer programming - Rails;
D O I
暂无
中图分类号
学科分类号
摘要
There are a few trains running parallelly on a congested high-speed railway corridor at different periods daily. Hence passengers can choose freely among them. Their preference of departing period choice is the main factor determining the distribution of passenger demands. The objective of this paper was to meet, to the maximum extent possible, the passengers’ preference demands of departing periods and to work out reasonable train stopping operations to avoid congestion. Firstly, two vital affecting factors, attractivity and congestion, were analyzed. Meanwhile, the passenger travel impedance function was established, and a bi-level programming model was constructed. The upper integer planning model regarded the minimum operation cost as the goal to decide train stopping operations and its running frequency. The lower model was a user-equilibrium one aimed at distributing passenger flows scheme based on the optimal train stopping operation. Finally, a heuristic algorithm embedded with Frank-Wolfe algorithm was designed based on model characteristics, and a simulation calculation was carried outto verify both the model and the algorithm. © 2021, Central South University Press. All rights reserved.
引用
收藏
页码:861 / 868
相关论文
共 50 条
  • [31] Effect of Train Headway on Voltage Collapes in High-Speed AC Railways
    Aodsup, Kokiat
    Kulworawanichpong, Thanatchai
    2012 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2012,
  • [32] Modeling of dynamic train-bridge interaction in high-speed railways
    Salcher, Patrick
    Adam, Christoph
    ACTA MECHANICA, 2015, 226 (08) : 2473 - 2495
  • [33] Train operation conflict management research status of high-speed railways
    Wen C.
    Journal of Transportation Security, 2011, 4 (3) : 231 - 246
  • [34] A Bi-level Programming Approach of Economic Dispatch of Electricity Retailers
    Zhang, Rui
    Chen, Zhe
    Teng, Yun
    Hu, Yu
    2023 5TH ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM, AEEES, 2023, : 1418 - 1422
  • [35] A Bi-Level Programming Approach to Optimize Ship Fouling Cleaning
    Wang, Wei
    Guo, Haoran
    Li, Fei
    Zhen, Lu
    Wang, Shuaian
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2023, 11 (12)
  • [36] A nonlinear bi-level programming approach for product portfolio management
    Ma, Shuang
    SPRINGERPLUS, 2016, 5
  • [37] Interactive fuzzy programming approach to Bi-level quadratic fractional programming problems
    Mishra, S
    Ghosh, A
    ANNALS OF OPERATIONS RESEARCH, 2006, 143 (01) : 251 - 263
  • [38] Focus programming: a bi-level programming approach to static stochastic optimization problems
    Guo, Peijun
    Zhu, Xide
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2023, 30 (06) : 3833 - 3862
  • [39] Interactive fuzzy programming approach to Bi-level quadratic fractional programming problems
    Savita Mishra
    Ajit Ghosh
    Annals of Operations Research, 2006, 143 : 251 - 263
  • [40] Working out an incomplete cyclic train timetable for high-speed railways by computer
    Yang, D.
    Nie, L.
    Tan, Y.
    He, Z.
    Zhang, Y.
    COMPUTERS IN RAILWAYS XII: COMPUTER SYSTEM DESIGN AND OPERATION IN RAILWAYS AND OTHER TRANSIT SYSTEMS, 2010, 114 : 889 - 900