A bi-level programming approach of period-preferred train operations for high-speed railways

被引:0
|
作者
Huang, Zhipeng [1 ]
Tian, Zhiqiang [1 ]
Si, Xiaoxin [2 ]
机构
[1] School of Traffic and Transportation, Lanzhou Jiaotong University, Lanzhou,730070, China
[2] Lanzhou Railway Station Operation Depot, China Railway Lanzhou Group Co., Ltd., Lanzhou,730050, China
关键词
Railroads - Railroad transportation - Integer programming - Rails;
D O I
暂无
中图分类号
学科分类号
摘要
There are a few trains running parallelly on a congested high-speed railway corridor at different periods daily. Hence passengers can choose freely among them. Their preference of departing period choice is the main factor determining the distribution of passenger demands. The objective of this paper was to meet, to the maximum extent possible, the passengers’ preference demands of departing periods and to work out reasonable train stopping operations to avoid congestion. Firstly, two vital affecting factors, attractivity and congestion, were analyzed. Meanwhile, the passenger travel impedance function was established, and a bi-level programming model was constructed. The upper integer planning model regarded the minimum operation cost as the goal to decide train stopping operations and its running frequency. The lower model was a user-equilibrium one aimed at distributing passenger flows scheme based on the optimal train stopping operation. Finally, a heuristic algorithm embedded with Frank-Wolfe algorithm was designed based on model characteristics, and a simulation calculation was carried outto verify both the model and the algorithm. © 2021, Central South University Press. All rights reserved.
引用
收藏
页码:861 / 868
相关论文
共 50 条
  • [1] A Bi-level Real-time Rescheduling Approach for Train Operation in High-speed Railways
    Liu, Fan
    Xun, Jing
    Dong, Hairong
    Zhang, Zixuan
    Li, Yanyan
    2021 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE (ITSC), 2021, : 2417 - 2422
  • [2] High-Speed Railway Timetable Rescheduling Method: A Bi-level Integrated Programming Approach
    Zhang, Huiru
    Jia, Limin
    Wang, Li
    Qin, Yong
    An, Min
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON ELECTRICAL AND INFORMATION TECHNOLOGIES FOR RAIL TRANSPORTATION (EITRT) 2017: TRANSPORTATION, 2018, 483 : 639 - 647
  • [3] Optimization of train schedule with uncertain maintenance plans in high-speed railways: A stochastic programming approach
    Ji, Hangyu
    Wang, Rui
    Zhang, Chuntian
    Yin, Jiateng
    Ma, Lin
    Yang, Lixing
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2024, 124
  • [4] Optimization of neutral section location on high-speed railways with consideration of train operations
    Miao, R.
    Wu, C.
    Lu, S.
    Xue, F.
    Tian, Z.
    Hillmansen, S.
    SUSTAINABLE BUILDINGS AND STRUCTURES: BUILDING A SUSTAINABLE TOMORROW, 2020, : 171 - 177
  • [5] ARCHITECTURAL DESIGN OF A BI-LEVEL IMAGE HIGH-SPEED CODEC
    HORIE, H
    OZAKI, T
    SHIRAI, H
    IIZUKA, Y
    IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS FOR VIDEO TECHNOLOGY, 1994, 4 (06) : 527 - 535
  • [6] Evolutionary bi-level model for optimizing ticket fares and operations profit of Taiwan high-speed rail
    Chou, Jui-Sheng
    Ongkowijoyo, Citra S.
    Ngoc-Tri Ngo
    Chen, Shih-Yun
    RESEARCH IN TRANSPORTATION BUSINESS AND MANAGEMENT, 2020, 37
  • [7] A Bi-Level Passenger Preference-Oriented Line Planning Model for High-Speed Railway Operations
    Yang, Yuxiang
    Li, Jie
    Wen, Chao
    Huang, Ping
    Peng, Qiyuan
    Lessan, Javad
    TRANSPORTATION RESEARCH RECORD, 2018, 2672 (10) : 224 - 235
  • [8] Bi-level programming model on passenger train operation in emergency
    Wang, Li
    Zhu, Tao
    Xu, Jie
    Jin, Lei
    Qin, Yong
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2015, 45 (05): : 996 - 1001
  • [9] Train operation conflict detection for high-speed railways: a naive Bayes approach
    Li, Jie
    Li, Zhongcan
    Wen, Chao
    Peng, Qiyuan
    Huang, Ping
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2023, 11 (02) : 188 - 206
  • [10] A CONFIGURATION METHODOLOGY FOR HIGH-SPEED, BI-LEVEL IMAGE CODEC LSI
    SATO, F
    MURAYAMA, M
    ELECTRONICS AND COMMUNICATIONS IN JAPAN PART III-FUNDAMENTAL ELECTRONIC SCIENCE, 1994, 77 (02): : 24 - 34