Key Construction Techniques for Pingtan Straits Rail-cum-Road Bridge

被引:0
|
作者
Liu, Zi-Ming [1 ]
机构
[1] China Railway Major Bridge Engineering Group Co., Ltd., Wuhan,430050, China
来源
Bridge Construction | 2019年 / 49卷 / 05期
关键词
Cable stayed bridges;
D O I
暂无
中图分类号
学科分类号
摘要
The Contract FPZQ-3 of the Pingtan Straits Rail-cum-Road Bridge project consists of three navigational channel bridges (all two-pylon steel truss-concrete hybrid girder cable-stayed bridges), a 34-span simply-supported steel truss-concrete composite girder bridge and a 119-span concrete box girder bridge, with a total length of about 11.15 km. The construction of the bridge faces challenges imposed by heavy winds, high waves, deep seawater, raging torrents and large tidal ranges and complex geological conditions. The winds and waves are monitored and forecasted to direct the construction. For the foundation construction, the platform is erected before the launching of the cofferdam, and long trestles, pile hole drilling platforms and large-diameter bored piles are used. The pile caps of the pylon piers are constructed with the aid of the dumbbell-shaped anti-collision box cofferdams. The pylons are erected by the use of fully-closed hydraulic climbing formworks. Different wind-resistant measures are taken, such as choosing the fully-closed wind-resistant hydraulic climbing formworks, attaching walls to stabilize the tower crane that has a lifting capacity of 11 000 kN•m, and using spatial trusses as the lateral bracings. The steel truss girders in the navigational spans are assembled from integral fully-welded truss sections that are lifted and installed by girder erection cranes or the floating crane with a capacity of 3 600 t. The concrete box girders are cast by the use of offshore bridge building machine and scaffoldings. The simply-supported steel truss girders in a span are manufactured as an integral unit, and delivered to the construction site to be lifted and installed by the 3 600 t-capacity floating crane. © 2019, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:1 / 8
相关论文
共 50 条
  • [21] Key Techniques for Construction of Pylons of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Wang, Ling-Xia
    Liu, Ai-Lin
    Bridge Construction, 2019, 49 (04): : 1 - 6
  • [22] Technique to Mitigate Deck-Main Truss Interaction of Steel Truss Girder by Preloading Main Truss for Pingtan Straits Rail-cum-Road Bridge
    平潭海峡公铁大桥钢桁梁预压主桁减小桥面系与主桁共同作用技术
    1600, Wuhan Bridge Research Institute (50): : 107 - 112
  • [23] Design of Main Bridge of Xihoumen Rail-cum-Road Bridge
    Xiao, Hai-Zhu
    Gao, Zong-Yu
    Liu, Jun-Feng
    Bridge Construction, 2020, 50 : 1 - 8
  • [24] Design of Main Bridge of Taoyaomen Rail-cum-Road Bridge
    Yi L.
    Pan T.
    Xu K.
    Dai H.
    Qiu Y.
    Bridge Construction, 2023, 53 : 43 - 49
  • [25] Key Construction Techniques of Extra Wide Steel Box Girders in Main Bridge of Lingang Changjiang River Rail-cum-Road Bridge in Yibin
    Yang R.
    Chen Z.
    Yu Z.
    Chen B.
    Hua S.
    Bridge Construction, 2024, 54 (01) : 16 - 22
  • [26] Construction techniques for upper cross beams of pylons of Huanggang Changjiang River Rail-cum-Road bridge
    Zhang, D.-Z. (357723363@qq.com), 1600, Wuhan Bridge Research Institute (43):
  • [27] Construction Techniques for Main Bridge of Yibin Jinshajiang River Rail-cum-Road Bridge on Chengdu-Guiyang Railway
    Li, Yan-Zhe
    Bridge Construction, 2021, 51 (03): : 9 - 16
  • [28] Key Construction Techniques for Cofferdam of Pier Z4 of Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Dun L.
    Wang L.-X.
    Bridge Construction, 2023, 53 (02) : 10 - 16
  • [29] Key Techniques for Constructing Foundation of Pier No.2 of Wuhu Changjiang River Rail-cum-Road Bridge
    Zhang, Shu-Cai
    Bridge Construction, 2019, 49 (03) : 6 - 10
  • [30] Construction Techniques for Composite Cofferdam of Pier No.3 of Lingang Changjiang River Rail-cum-Road Bridge
    Zhang, Cheng-Ran
    Zhu, Bing
    Zhang, Zhen
    Zhao, Yu-Jia
    Bridge Construction, 2020, 50 (04) : 101 - 106