Hurricane Harvey highlights: Need to assess the adequacy of probable maximum precipitation estimation methods

被引:0
|
作者
Kao S.-C. [1 ]
DeNeale S.T. [2 ]
Watson D.B. [2 ]
机构
[1] Environmental Sciences Division and Climate Change Science Institute, Oak Ridge National Laboratory, P.O. Box 2008, MS-6038, Oak Ridge, 37831, TN
[2] Environmental Sciences Division, Oak Ridge National Laboratory, P.O. Box 2008, MS-6038, Oak Ridge, 37831, TN
来源
Journal of Hydrologic Engineering | 2019年 / 24卷 / 04期
关键词
Hurricane Harvey; Infrastructure safety; Probable maximum precipitation; Stage IV quantitative precipitation estimate (QPE);
D O I
10.1061/(asce)he.1943-5584.0001768
中图分类号
学科分类号
摘要
Probable maximum precipitation (PMP) is the primary criterion used to design flood protection measures for critical infrastructures such as dams and nuclear power plants. Based on our analysis using the Stage IV (ST4) quantitative precipitation estimates, precipitation associated with Hurricane Harvey near Houston, Texas, represents a PMP-scale storm and partially exceeds the Hydrometeorological Report No. 51 (HMR51) 72-h PMP estimates at 5,000 mi2 (ST4 = 805 mm; HMR51 = 780 mm) and 10,000 mi2 (ST4 = 686 mm; HMR51 = 673 mm). We also find statistically significant increasing trends since 1949 in the annual maximum total precipitable water and dew point temperature observations along the US Gulf Coast region, suggesting that, if the trend continues, the theoretical upper bound of PMP could be even larger. Our analysis of Hurricane Harvey rainfall data demonstrates that an extremely large PMP-scale storm is physically possible and that PMP estimates should not be considered overly conservative. This case study highlights the need for improved PMP estimation methodologies to account for long-term trends and to ensure the safety of our critical infrastructures. © 2019 American Society of Civil Engineers.
引用
收藏
相关论文
共 50 条
  • [21] Estimation of time-variant probable maximum precipitation for South Korea
    Kim, Nam Won
    Lee, Jeongwoo
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (03) : 1031 - 1038
  • [22] Estimation of time-variant probable maximum precipitation for South Korea
    Nam Won Kim
    Jeongwoo Lee
    KSCE Journal of Civil Engineering, 2017, 21 : 1031 - 1038
  • [23] Estimation of Probable Maximum Precipitation for Dams in the Hongru River Catchment, China
    Cecilia Svensson
    P. R. Rakhecha
    Theoretical and Applied Climatology, 1998, 59 : 79 - 91
  • [24] Estimation of probable maximum precipitation for dams in the Hongru river catchment, China
    Svensson, C
    Rakhecha, PR
    THEORETICAL AND APPLIED CLIMATOLOGY, 1998, 59 (1-2) : 79 - 91
  • [25] Estimation of Probable Maximum Precipitation in Korea using a Regional Climate Model
    Lee, Jeonghoon
    Choi, Jeonghyeon
    Lee, Okjeong
    Yoon, Jaeyoung
    Kim, Sangdan
    WATER, 2017, 9 (04)
  • [26] Estimation of probable maximum precipitation of a high-mountain basin in a changing climate
    Liu, Tian
    Li, Binquan
    Jin, Luyi
    Wang, Shiwu
    Wen, Jinhua
    Wang, Helong
    HYDROLOGY RESEARCH, 2022, 53 (01): : 221 - 240
  • [27] Concept of Threshold in the Estimation of Probable Maximum Precipitation: Hershfield's Method Revisited
    Fernando, W. C. D. K.
    Wickramasuriya, S. S.
    JOURNAL OF HYDROLOGIC ENGINEERING, 2021, 26 (03)
  • [28] Updating the estimation of 1-day probable maximum precipitation in South Africa
    Johnson, Katelyn A.
    Smithers, Jeffrey C.
    JOURNAL OF HYDROLOGY-REGIONAL STUDIES, 2020, 32
  • [29] Probable maximum precipitation estimation using multifractals: Application in the eastern United States
    Douglas, EM
    Barros, AP
    JOURNAL OF HYDROMETEOROLOGY, 2003, 4 (06) : 1012 - 1024
  • [30] ESTIMATION OF PROBABLE MAXIMUM PRECIPITATION FOR CATCHMENTS IN EASTERN INDIA BY A GENERALIZED-METHOD
    RAKHECHA, PR
    MANDAL, BN
    KULKARNI, AK
    DESHPANDE, NR
    THEORETICAL AND APPLIED CLIMATOLOGY, 1995, 51 (1-2) : 67 - 74