共 50 条
- [2] Improving the performance of an existing air-cooled binary geothermal power plant: A case study [J]. JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1999, 121 (03): : 196 - 202
- [3] COMPARISON OF THERMOECONOMIC COST CALCULATION FOR A BINARY GEOTHERMAL POWER PLANT [J]. JOURNAL OF THERMAL ENGINEERING, 2018, 4 (05): : 2355 - 2370
- [7] Thermoeconomic optimization of the retrofit of an existing steam cycle power plant. [J]. OCOS 2000: FROM THERMO-ECONOMICS TO SUSTAINABILITY, PTS 1-4, 2000, : 245 - 258