Modelling and Simulation of Existing Geothermal Power Plant: A Case Study of Darajat Geothermal Power Plant

被引:1
|
作者
Sukra, K. F. A. [1 ]
Permana, D. I. [2 ,3 ]
Adriansyah, W. [4 ]
机构
[1] Natl Res & Innovat Agcy, Res Ctr Transportat Technol, South Tangerang 15314, Indonesia
[2] Hungarian Univ Agr & Life Sci, Doctoral Sch Mech Engn, H-2100 Godollo, Hungary
[3] Inst Teknol Nas Bandung, Dept Mech Engn, Bandung 40124, Indonesia
[4] Inst Teknol Bandung, Thermodynam Labs, 3rd floor PAU Bldg, Bandung 40116, Indonesia
关键词
Geothermal energy; design; simulation; power loss; environmental relative humidity; PERFORMANCE; GENERATION; PROSPECTS; ENERGY;
D O I
10.5541/ijot.1118778
中图分类号
O414.1 [热力学];
学科分类号
摘要
The electrical energy needs grow every year, increasing awareness and use of renewable energy even higher. Geothermal power plants (GPP) are even ogled as a renewable energy source that has a lot of potential worldwide. Technology for GPP continues to evolve. However, tools for analyzing a system of GPP are still inadequate. In this study, a simple analysis tool was designed. The usefulness of this analysis tool is to be able to know the state of the GPP works. This tool will help simulate the conditions that may occur in the plant system. The simulation results will also be known operating conditions that may occur, so the operator can determine what should be done if things happen. Modeling started using Microsoft Excel, which has been equipped with thermodynamic properties. Modeling includes turbine, condenser, cooling tower, and extraction systems non-condensable gas. After validated, the model run simulation in variations that may occur such as decline in the condition of the condenser and cooling tower and environmental conditions, represented by relative humidity. The simulation with variation of condition will decrease the power generated from turbine 3 - 5%.
引用
收藏
页码:13 / 20
页数:8
相关论文
共 50 条
  • [1] Energy Optimization Modeling of Geothermal Power Plant ( Case Study: Darajat Geothermal Field Unit III
    Sinaga, R. H. M.
    Darmanto, P. S.
    [J]. 5th ITB International Geothermal Workshop (IIGW2016), 2016, 42
  • [2] Monitoring Ripple Voltage in Darajat Geothermal Power Plant
    Zainal, Yuda Bakti
    Sambasri, Susanto
    [J]. 2014 INTERNATIONAL CONFERENCE ON POWER ENGINEERING AND RENEWABLE ENERGY (ICPERE), 2014, : 242 - 247
  • [3] Use of the Kalina cycle as a bottoming cycle in a geothermal power plant: Case study of the Wayang Windu geothermal power plant
    Prananto, Lukman Adi
    Zaini, Ilman Nuran
    Mahendranata, Bobby Irawan
    Juangsa, Firman Bagja
    Aziz, Muhammad
    Soelaiman, Tubagus Ahmad Fauzi
    [J]. APPLIED THERMAL ENGINEERING, 2018, 132 : 686 - 696
  • [4] Performance Investigation of Geothermal Power Plant Based on Exergy and Exergoeconomic Analyses (Case Study: Sarulla Geothermal Power Plant)
    Sinaga, R. H. M.
    Saputra, D. W.
    [J]. 9TH ANNUAL BASIC SCIENCE INTERNATIONAL CONFERENCE 2019 (BASIC 2019), 2019, 546
  • [5] Optimizing the Utility Power of a Geothermal Power Plant using Variable Frequency Drive (VFD) (Case Study: Sibayak Geothermal Power Plant)
    Sinaga, R. H. M.
    Manik, Y.
    [J]. INTERNATIONAL CONFERENCE ON SCIENCE, INFRASTRUCTURE TECHNOLOGY AND REGIONAL DEVELOPMENT (ICOSITER) 2016: ENERGY SECURITY FOR ENHANCING NATIONAL COMPETITIVENESS, 2018, 124
  • [6] IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY
    Yilmaz, Ceyhun
    [J]. ISI BILIMI VE TEKNIGI DERGISI-JOURNAL OF THERMAL SCIENCE AND TECHNOLOGY, 2020, 40 (01) : 37 - 51
  • [7] Improving performance and thermoeconomic optimization of an existing binary geothermal power plant: A case study
    Yilmaz, Ceyhun
    [J]. Isi Bilimi Ve Teknigi Dergisi/ Journal of Thermal Science and Technology, 2020, 40 (01): : 37 - 51
  • [8] Examination and thermodynamic modelling of a geothermal energy power plant for sustainable development: a case study
    Akbay, Oguzhan
    Yilmaz, Fatih
    [J]. INTERNATIONAL JOURNAL OF EXERGY, 2022, 38 (04) : 398 - 410
  • [9] Energy and exergy analysis of dry-steam geothermal power plant: Case study in kamojang geothermal power plant unit 2
    Setyawan, Nova Dany
    Pambudi, Nugroho Agung
    Utomo, Frandhoni
    Saputro, Herman
    Adiprana, Reza
    Saw, Lip Huat
    Gurturk, Mert
    Rudiyanto, Bayu
    [J]. 3RD ANNUAL APPLIED SCIENCE AND ENGINEERING CONFERENCE (AASEC 2018), 2018, 197
  • [10] Biocorrosion in a geothermal power plant
    Navarrete-bedolla, M
    Ballesteros-Almanza, ML
    Sánchez-Yañez, JM
    Valdéz-Salas, B
    Hernández-Duque, G
    [J]. MATERIALS PERFORMANCE, 1999, 38 (04) : 52 - 56