共 50 条
- [42] A simulated annealing approach to machine grouping problem considering processing times and machine capacities 6TH INDUSTRIAL ENGINEERING RESEARCH CONFERENCE PROCEEDINGS: (IERC), 1997, : 228 - 233
- [45] A Simulated Annealing Heuristic for Minimizing Makespan in Parallel Machine Scheduling SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, (SEMCCO 2012), 2012, 7677 : 198 - 205
- [46] Minimizing the makespan for different volume parallel batch-processing machines problem with release times and job sizes ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1509 - 1514
- [47] Minimizing Makespan for Single Batch Processing Machine with Non-identical Job Sizes Using a Novel Algorithm: Free Search 2009 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND COMPUTER SCIENCE, VOL 1, PROCEEDINGS, 2009, : 179 - 183
- [48] Scheduling a single batch-processing machine with disagreeable ready times and due dates INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2003, 10 (02): : 175 - 187
- [50] GRASP to minimize makespan for a capacitated batch-processing machine INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (1-4): : 407 - 414