Minimising makespan of a batch processing machine with unequal job ready times using simulated annealing

被引:0
|
作者
Ghrayeb L. [1 ]
Damodaran P. [1 ]
机构
[1] Department of Industrial and Systems Engineering, Northern Illinois University, DeKalb, 60115, IL
关键词
batch processing machine; BPM; makespan; scheduling; simulated annealing;
D O I
10.1504/IJISE.2021.10045063
中图分类号
学科分类号
摘要
Batch processing machines can process multiple jobs simultaneously. Given a set of jobs with their processing times, ready times, and sizes, the objective is to minimise the makespan. Two interdependent decisions are required: group jobs to form batches and schedule batches on the machine. The processing and ready times of the batch depends on the composition of the batch. Batch ready time is equal to the largest ready time of all the jobs in a batch. Similarly, batch processing time is equal to the largest processing time of all the jobs in a batch. As the problem under study is NP-hard, a simulated annealing (SA) approach is proposed. The proposed approach is evaluated by comparing its solution quality and run time with a commercial solver used to solve a mathematical formulation. An experimental study shows that the SA approach is fast in finding good solutions as the problem size increases. Copyright © 2023 Inderscience Enterprises Ltd.
引用
收藏
页码:222 / 237
页数:15
相关论文
共 50 条
  • [41] Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines
    Monch, L
    Zimmermann, J
    Otto, P
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2006, 19 (03) : 235 - 245
  • [42] A simulated annealing approach to machine grouping problem considering processing times and machine capacities
    Zolfaghari, S
    Liang, M
    6TH INDUSTRIAL ENGINEERING RESEARCH CONFERENCE PROCEEDINGS: (IERC), 1997, : 228 - 233
  • [43] Makespan optimization in a single-machine scheduling problem with dynamic job ready times-Complexity and algorithms
    Gorczyca, Mateusz
    Janiak, Adam
    Janiak, Wladyslaw
    Dymanski, Marcin
    DISCRETE APPLIED MATHEMATICS, 2015, 182 : 162 - 168
  • [44] Simulated annealing approach for minimizing the makespan of the general job-shop
    Satake, T
    Morikawa, K
    Takahashi, K
    Nakamura, N
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 : 515 - 522
  • [45] A Simulated Annealing Heuristic for Minimizing Makespan in Parallel Machine Scheduling
    Laha, Dipak
    SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, (SEMCCO 2012), 2012, 7677 : 198 - 205
  • [46] Minimizing the makespan for different volume parallel batch-processing machines problem with release times and job sizes
    Wang, Hui-Mei
    Chou, Fuh-Der
    Huang, Chun-Ying
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1509 - 1514
  • [47] Minimizing Makespan for Single Batch Processing Machine with Non-identical Job Sizes Using a Novel Algorithm: Free Search
    Zhang, Ya-ling
    Chen, Hua-ping
    Shao, Hao
    Xu, Rui
    2009 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND COMPUTER SCIENCE, VOL 1, PROCEEDINGS, 2009, : 179 - 183
  • [48] Scheduling a single batch-processing machine with disagreeable ready times and due dates
    Cheraghi, SH
    Vishwaram, V
    Krishnan, KK
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2003, 10 (02): : 175 - 187
  • [49] Minimising the makespan in the two-machine job shop problem under availability constraints
    Benttaleb, Mourad
    Hnaien, Faicel
    Yalaoui, Farouk
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (05) : 1427 - 1457
  • [50] GRASP to minimize makespan for a capacitated batch-processing machine
    Damodaran, Purushothaman
    Ghrayeb, Omar
    Guttikonda, Mallika Chowdary
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (1-4): : 407 - 414