Minimising makespan of a batch processing machine with unequal job ready times using simulated annealing

被引:0
|
作者
Ghrayeb L. [1 ]
Damodaran P. [1 ]
机构
[1] Department of Industrial and Systems Engineering, Northern Illinois University, DeKalb, 60115, IL
关键词
batch processing machine; BPM; makespan; scheduling; simulated annealing;
D O I
10.1504/IJISE.2021.10045063
中图分类号
学科分类号
摘要
Batch processing machines can process multiple jobs simultaneously. Given a set of jobs with their processing times, ready times, and sizes, the objective is to minimise the makespan. Two interdependent decisions are required: group jobs to form batches and schedule batches on the machine. The processing and ready times of the batch depends on the composition of the batch. Batch ready time is equal to the largest ready time of all the jobs in a batch. Similarly, batch processing time is equal to the largest processing time of all the jobs in a batch. As the problem under study is NP-hard, a simulated annealing (SA) approach is proposed. The proposed approach is evaluated by comparing its solution quality and run time with a commercial solver used to solve a mathematical formulation. An experimental study shows that the SA approach is fast in finding good solutions as the problem size increases. Copyright © 2023 Inderscience Enterprises Ltd.
引用
收藏
页码:222 / 237
页数:15
相关论文
共 50 条
  • [1] Minimising makespan of batch processing machine with unequal ready times
    Ghrayeb L.
    Muthuswamy S.
    Damodaran P.
    International Journal of Industrial and Systems Engineering, 2022, 40 (04): : 496 - 512
  • [2] A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (01) : 1451 - 1458
  • [3] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (9-12): : 1119 - 1128
  • [4] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Purushothaman Damodaran
    Mario C. Velez-Gallego
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 1119 - 1128
  • [5] Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing
    Melouk, S
    Damodaran, P
    Chang, PY
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 87 (02) : 141 - 147
  • [6] A Hybrid Differential Evolution Algorithm for Scheduling Parallel Batch Processing Machine with Unequal Job Ready Times
    Jafari, Azizollah
    Hassani, Somayeh
    Chiniforooshan, Payam
    WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, WCECS 2012, VOL II, 2012, : 1421 - 1426
  • [7] Efficient algorithms to minimize makespan of the unrelated parallel batch-processing machines scheduling problem with unequal job ready times
    Zarook, Yaser
    Rezaeian, Javad
    Mahdavi, Iraj
    Yaghini, Masoud
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (03) : 1501 - 1522
  • [8] A simulated annealing approach to minimise makespan in a hybrid flowshop with a batch processing machine
    Upadhyayula S.R.K.
    Muthuswamy S.
    Damodaran P.
    International Journal of Industrial and Systems Engineering, 2022, 40 (04) : 513 - 532
  • [9] Minimising makespan on a batch processing machine using heuristics improved by an enumeration scheme
    Li, XiaoLin
    Li, YuPeng
    Wang, Yu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (01) : 176 - 186
  • [10] Minimising makespan on a single batch processing machine with dynamic job arrivals and non-identical job sizes
    Zhou, Shengchao
    Chen, Huaping
    Xu, Rui
    Li, Xueping
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2258 - 2274