High performing team characteristics for Malaysian oil and gas construction projects

被引:0
|
作者
Vereya, Davendren [1 ]
Ismail, Syuhaida [1 ]
机构
[1] Razak Faculty of Technology and Informatics, Universiti Teknologi Malaysia, Kuala Lumpur, Kuala Lumpur,54100, Malaysia
来源
关键词
52;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:882 / 894
相关论文
共 50 条
  • [21] Design team characteristics in aerospace, construction and product design for co-located and distributed projects
    Edum-Fotwe, FT
    Thorpe, A
    Gregory, MJ
    Deasley, PJ
    Wootton, AB
    North, ANW
    Cooper, R
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 289 - 297
  • [22] Effects of team diversity on project performance in construction projects
    Wu, Guangdong
    Zhao, Xianbo
    Zuo, Jian
    Zillante, George
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (03) : 408 - 423
  • [23] Core Project Team As a Management Entity for Construction Projects
    Keinanen, Marko
    Kahkonen, Kalle
    IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2018, 9 (13): : 208 - 217
  • [24] Identifying and Ranking the Root Causes of Schedule Delays in Oil and Gas Pipeline Construction Projects
    Alshibani, Adel
    Julaih, Mohammed
    Adress, Ahamd
    Alshamrani, Othman
    Almaziad, Faris
    ENERGIES, 2023, 16 (01)
  • [25] Managing Cost Risks in Oil and Gas Construction Projects: Root Causes of Cost Overruns
    Esmaeili, Iraj
    Kashani, Hamed
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2022, 8 (01)
  • [26] Engineering and construction projects for oil and gas processing facilities: Contracting, uncertainty and the economics of information
    Berends, Kees
    ENERGY POLICY, 2007, 35 (08) : 4260 - 4270
  • [27] Environmental Study on Methods of Handling Construction Waste for Achieving Sustainability in Malaysian Construction Projects
    Nawi, Mohd Nasrun Mohd
    Osman, Nur Najihah
    Osman, Wan Nadzri
    Zulhumadi, Faisal
    Riazi, Salman Riazi Mehdi
    EKOLOJI, 2018, 27 (106): : 1041 - 1046
  • [28] Criticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian Projects
    Yap, Jeffrey Boon Hui
    Chow, Ian Ni
    Shavarebi, Kamran
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (05)
  • [29] RANKING OF EFFECTS OF CONSTRUCTION DELAY: EVIDENCE FROM MALAYSIAN BUILDING PROJECTS
    Ullah, K.
    Khan, M. S.
    Lakhiar, M. T.
    Vighio, A. A.
    Sohu, S.
    JOURNAL OF APPLIED ENGINEERING SCIENCES, 2018, 8 (01): : 79 - 84
  • [30] Environmental assessment for oil and gas projects
    Mar Pollut Bull, 3 (177):