Establishment of micro hydropower power generation facilities in mountain areas

被引:0
|
作者
Lee C.-M. [2 ]
Kim J.-G. [1 ]
机构
[1] Dept. of Electrical Engineering, Gangneung-wonju National University
关键词
Active power; Cross flow turbine; Induction Generator; Micro hydro power; Power factor; Reactive power;
D O I
10.5370/KIEE.2021.70.11.1685
中图分类号
学科分类号
摘要
Hydropower energy is well known as clean renewable energy. In particular, hydroelectric energy has a great advantage in that it has high efficiency compared to other energy sources. In addition, it is possible to obtain stable and constant output at all times due to its high operating rate. Compared to other countries, Korea has mountainous terrain and many small rivers. In these sites, it will be possible to build a power generation facility with a micro-level output rather than a high power generation output. The most important factors in determining generator output are flow and head. In order to operate the generator most efficiently, a constant flow rate must be maintained at all times, and the amount of head must be be the same. In general, small rivers in rural areas have large fluctuations in flow rate. Therefore, the selection of the water turbine is very important. In this study, a cross-flow water turbine that can easily respond to changes in flow rate selected, and a squirrel cage induction generator was applied in consideration of economic feasibility and maintenance when selecting a generator. This research team compared and analyzed the difference between design and operation through simulation and measurement of the power and power factor obtained from the induction generator when it is installed and operated in the field after determining the output considering the flow rate and the head. © 2021 Korean Institute of Electrical Engineers. All rights reserved.
引用
收藏
页码:1685 / 1690
页数:5
相关论文
共 50 条
  • [31] Projection of Future Hydropower Generation in Samanalawewa Power Plant, Sri Lanka
    Khaniya, Bhabishya
    Karunanayake, Chamaka
    Gunathilake, Miyuru B.
    Rathnayake, Upaka
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020 (2020)
  • [32] Energy-saving generation scheduling strategy of hydropower and thermal power plants considering cascaded hydropower stations
    College of Electrical Engineering, Guizhou University, Guiyang 550025, Guizhou Province, China
    Dianwang Jishu, 3 (616-621):
  • [33] Pilot study about the micro hydropower generation by use of flow induced vibration phenomenon
    Yokoi, Yoshifumi
    EFM17 - EXPERIMENTAL FLUID MECHANICS 2017, 2018, 180
  • [34] Alternative power generation technologies: Use of distributed power for telecommunications facilities and operations
    Darghouth, Naim R.
    Blazek, Michele
    Kammen, Daniel M.
    PROCEEDINGS OF THE 2006 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2006, : 67 - +
  • [35] Comparative assessment of low-capacity power facilities for distributed power generation
    D. O. Smolentsev
    O. N. Ivina
    Atomic Energy, 2012, 111 : 351 - 354
  • [36] COMPARATIVE ASSESSMENT OF LOW-CAPACITY POWER FACILITIES FOR DISTRIBUTED POWER GENERATION
    Smolentsev, D. O.
    Ivina, O. N.
    ATOMIC ENERGY, 2012, 111 (05) : 351 - 354
  • [37] Run-of-river Power Plant Sohlstufe Lehen - Hydropower within Urban Areas
    Pfisterer, Martin
    WASSERWIRTSCHAFT, 2012, 102 (7-8) : 65 - 70
  • [38] Short-term hydropower planning coordinated with wind power in areas with congestion problems
    Matevosyan, Julija
    Soder, Lennart
    WIND ENERGY, 2007, 10 (03) : 195 - 208
  • [39] Next generation micro-power systems
    Chandrakasan, Anantha P.
    Daly, Denis C.
    Kwong, Joyce
    Ramadass, Yogesh K.
    2008 SYMPOSIUM ON VLSI CIRCUITS, DIGEST OF TECHNICAL PAPERS, 2008, : 2 - 5
  • [40] Next generation micro-power systems
    Chandrakasan, Anantha P.
    Daly, Denis C.
    Kwong, Joyce
    Ramadass, Yogesh K.
    2008 IEEE SYMPOSIUM ON VLSI CIRCUITS, 2008, : 1 - 4