Study on Reasonable Roadway Position of Working Face under Strip Coal Pillar in Rock Burst Mine

被引:0
|
作者
Yang, Hengze [1 ]
Guo, Zhongping [1 ]
Chen, Daozhi [1 ]
Wang, Chao [1 ]
Zhang, Fuyu [1 ]
Du, Zhaowen [1 ]
机构
[1] College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao, Shandong,266590, China
来源
Shock and Vibration | 2020年 / 2020卷
关键词
Deformation;
D O I
暂无
中图分类号
学科分类号
摘要
It is of great significance to study the reasonable position of mining roadway under strip coal pillar for increasing the stability of mining roadway, reducing the waste of resources, and realizing the safety production of working face. Based on the research background of the working face under the strip coal pillar in Jinqiao Coal Mine of Jining, Shandong Province, through theoretical analysis, similar material simulation experiment, and numerical simulation experiment, the stress distribution law, plastic failure range, and rationality of coal pillar setting in different width sections are systematically studied. Finally, the tailentry of working face is determined at the position of 5 m from the bottom of strip coal pillar to 1308 goaf. During the mining period of 1310 working face, the peak value of side abutment pressure is at the position of 3∼4 m; beyond 25 m in front of the coal wall, the deformation of the surrounding rock on the tailentry surface is small. After entering the advanced support section, the deformation of the two sides is mainly longitudinal crack expansion and local shallow small flakes; however, the roof is complete and stable. Therefore, the selection of tailentry location and coal pillar width has played a good role. The research results of this study can provide some reference for similar mine with similar geological and production technical conditions. © 2020 Hengze Yang et al.
引用
收藏
相关论文
共 50 条
  • [21] Study on the surrounding rock control theory of roadway in coal mine
    Yang, Shuang-Suo
    Meitan Xuebao/Journal of the China Coal Society, 2010, 35 (11): : 1842 - 1853
  • [22] Coal Mine Roadway Stability in Soft Rock: A Case Study
    Shen, Baotang
    ROCK MECHANICS AND ROCK ENGINEERING, 2014, 47 (06) : 2225 - 2238
  • [23] Coal Mine Roadway Stability in Soft Rock: A Case Study
    Baotang Shen
    Rock Mechanics and Rock Engineering, 2014, 47 : 2225 - 2238
  • [24] A study on microseismic monitoring of rock burst in coal mine
    Jiang Fu-Xing
    Yang Shu-Hua
    Cheng Yun-Hai
    Zhang Xing-Min
    Mao Zhong-Yu
    Xu Fang-Jun
    CHINESE JOURNAL OF GEOPHYSICS-CHINESE EDITION, 2006, 49 (05): : 1511 - 1516
  • [25] Analysis on Rock Burst Risks and Prevention of a 54 m-Wide Coal Pillar for Roadway Protection in a Fully Mechanized Top-Coal Caving Face
    Li, Zhihua
    Yang, Ke
    Ji, Jianshuai
    Jiao, Biao
    Tian, Xiaobing
    SHOCK AND VIBRATION, 2021, 2021
  • [26] A selection methodology on reasonable width of stabilized coal pillar for retracement channel in longwall working face
    Shan, Pengfei
    Meng, Zheng
    Lai, Xingping
    Xue, Xiongfei
    Li, Chenwei
    Wang, Jindong
    Li, Wei
    Zhang, Long
    Xi, Bojia
    Jiang, Hongjun
    FRONTIERS IN EARTH SCIENCE, 2024, 12
  • [27] Study on the Bearing Capacity of Coal Pillar Protecting Roadway in Deep Mining Face
    Wu, Shiliang
    Yang, Shunqiang
    DEVELOPMENT AND PROTECTION OF MINERAL RESOURCES, 2025, : 181 - 188
  • [28] Coal burst mechanism and prevention of large coal pillar gob-side heading face in deep mine
    Zhang, Ming
    Yang, Shiji
    Tu, Min
    Nian, Bin
    Liu, Tongda
    Du, Yan
    Wang, Dezhen
    Chang, Chunfeng
    Wu, Xiaojun
    Li, Jie
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2024, 41 (04): : 688 - 698
  • [29] A study of soft rock roadway coupling support in Xiajing Coal Mine
    Li Xuefeng
    Cheng Guihai
    Li Xiaoquan
    Zhang Ruichong
    2014 INTERNATIONAL SYMPOSIUM ON SAFETY SCIENCE AND TECHNOLOGY, 2015, 84 : 812 - 817
  • [30] Experimental and numerical study of drop hammer test on honeycomb sandwich panel resistant to rock burst in coal mine roadway
    Xu, Xiang
    Wu, Lili
    Wang, Hui
    Wu, Yu-Qi
    STRUCTURES, 2024, 65