Model tests on dynamic response of ballastless track X-shaped pile-raft foundation under long-term train loads

被引:0
|
作者
Sun, Guang-Chao [1 ,2 ]
Li, Jian-Lin [1 ]
Kong, Gang-Qiang [1 ,3 ]
Luo, Ya [2 ]
Wang, Le-Hua [1 ]
Deng, Hua-Feng [1 ]
机构
[1] Key Laboratory of Geological Hazards in Three Gorges Reservoir Area, China Three Gorges University, Yichang,443002, China
[2] Bureau of Public Works of Longgang District, Shenzhen,518100, China
[3] Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University, Nanjing,210098, China
关键词
Compilation and indexing terms; Copyright 2025 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
Stress analysis - Axial flow - Friction - Foundations - Geotechnical engineering
引用
收藏
页码:961 / 969
相关论文
共 33 条
  • [21] Research on Dynamic Performance of CRTSIII Type Slab Ballastless Track under Long-Term Service
    Zeng, Zhiping
    Xiao, Yancai
    Wang, Weidong
    Huang, Zhibin
    Wei, Wei
    Houdou, Saidi Boumedienne
    MATERIALS, 2022, 15 (06)
  • [22] Experimental Study on Stiffness Degradation of Ballastless Track-bridge Structure under Long-term Train Load
    Zhao L.
    Zhou L.
    Mahunon A.D.G.
    Zhang Y.
    Peng X.
    Yu Z.
    Tiedao Xuebao/Journal of the China Railway Society, 2021, 43 (05): : 136 - 143
  • [23] Long-term settlement calculation of saturated soft clay foundation under train moving loads
    Tao M.
    Shen Y.
    Wang X.
    Wang B.
    Du W.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2016, 47 (12): : 4206 - 4215
  • [24] Full-scale model tests on dynamic performances of ballastless high-speed railways under moving train loads
    Jiang, Hong-Guang
    Bian, Xue-Cheng
    Xu, Xiang
    Chen, Yun-Min
    Jiang, Jian-Qun
    Bian, X.-C., 1600, Chinese Society of Civil Engineering (36): : 354 - 362
  • [25] Analysis of rigid pile-raft composite foundation long-term deformation characteristic and control post-construction settlement of high-speed railway
    1600, CAFET INNOVA Technical Society, 1-2-18/103, Mohini Mansion, Gagan Mahal Road,, Domalguda, Hyderabad, 500029, India (07):
  • [26] Dynamic Response of Pile-Soil Foundation with an Adjacent Tunnel under the High-Speed Train Loads: A Case Study
    Xu, Qiang
    Zhu, Yongquan
    Xu, Shuo
    Fan, Haobo
    Wang, Dapeng
    Wang, Cong
    Zhang, Mingming
    Xing, Dandan
    Li, Yong
    APPLIED SCIENCES-BASEL, 2022, 12 (14):
  • [27] Long-term in-situ monitoring on foundation settlement and service performance of a novel pile-plank-supported ballastless tram track in soft soil regions
    Shan, Yao
    Huang, Aijun
    Qin, Xiaoguang
    Zhou, Shunhua
    Zhou, Xiangliang
    TRANSPORTATION GEOTECHNICS, 2022, 36
  • [28] Model tests on settlement of single pile in loess under long-term axial cyclic loading
    Guo, Peng-Fei
    Wang, Xu
    Yang, Long-Cai
    Luo, Hao-Wei
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2015, 37 (03): : 551 - 558
  • [29] Model Test Study on the Influence of Train Speed on the Dynamic Response of an X-Section Pile-Net Composite Foundation
    Xue, Shanshan
    Chen, Yumin
    Liu, Hanlong
    SHOCK AND VIBRATION, 2019, 2019
  • [30] Dynamic Response and Long-Term Settlement of a Compacted Loess Embankment under Moving Train Loading
    Rui Wang
    Zhiping Hu
    Jiakuan Ma
    Xiang Ren
    Fangtao Li
    Fei Zhang
    KSCE Journal of Civil Engineering, 2021, 25 : 4075 - 4087