Analysis on AHP-VIKOR-based Supplier Selection for Large Equipment Maintenance of Construction Enterprises

被引:0
|
作者
Zhu Z. [1 ]
Xin Y. [2 ]
Jing Y. [3 ]
机构
[1] Department of Public Education, Zhumadian Preschool Education College, Zhumadian
[2] Institute of Architecture Engineering, Huanghuai University, Zhumadian
[3] Department of Civil Engineering, UCSI University, Kuala Lumpur
关键词
Ahp; Large equipment maintenance; Project construction; Supplier selection; Vikor;
D O I
10.25103/jestr.156.06
中图分类号
学科分类号
摘要
A good operating state of large equipment in construction projects is the key to ensuring the construction period, improving the project performance, and effectively reducing project costs. Hence, the problem of supplier selection for large equipment maintenance of construction enterprises has elicited extensive attention from scholars in the industry. The uncontrollable factors affecting large equipment maintenance in construction projects are numerous due to the complicated construction conditions of construction projects. Scientific selection of appropriate equipment maintenance suppliers can provide more reliable technical support and maintenance services for the operation safety and safety of large equipment during construction. In this study, the main factors influencing supplier selection for large equipment maintenance of construction enterprises were comprehensively combed. With the supplier selection of a top-10 Chinese construction enterprise for large equipment maintenance as a case, the factors influencing supplier selection were analyzed using analytic hierarchy process (AHP) and VlseKriterijumska Optimizacija I Kompromisno Resenje (VIKOR). The group benefit value, individual regret value, and profit ratio were calculated, and schemes were compared and sorted. Results showed that the weights of the first-level indexes influencing supplier selection for large equipment maintenance of construction enterprises were sorted as enterprise competence (0.3321)>enterprise performance (0.2205)>service level (0.1748)>maintenance price (0.1381)>equipment quality (0.1345). Among the second-level indexes, the timely equipment maintainability, informatization level, and equipment maintenance price achieved the maximum weights. VIKOR-based calculation results revealed that supplier D ranked first, so it was selected by the construction enterprise as the supplier for large equipment maintenance of construction enterprises. On this basis, the practicability and operability of AHP and VIKOR in the scientific selection of suppliers were proved. The obtained conclusions are of important reference values for enriching the evaluation index system for construction enterprises to select large equipment suppliers, improving the quality of suppliers cooperating with construction enterprises, and enhancing the equipment management and maintenance efficiency of construction enterprises. © 2022 School of Science, IHU. All Rights Reserved.
引用
收藏
页码:42 / 48
页数:6
相关论文
共 50 条
  • [31] A fuzzy VIKOR method for supplier selection based on entropy measure for objective weighting
    Shemshadi, Ali
    Shirazi, Hossein
    Toreihi, Mehran
    Tarokh, M. J.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (10) : 12160 - 12167
  • [32] An Analysis of Comparison on Weighted AHP for Improving Supplier Selection in IT Outsourcing
    Fusiripong, Prashaya
    Baharom, Fauziah
    Yusof, Yuhanis
    PROCEEDINGS OF KNOWLEDGE MANAGEMENT INTERNATIONAL CONFERENCE (KMICE) 2018, 2018, : 388 - 392
  • [33] Study on supplier selection based on AHP and BP neural network
    Xia Bin
    Pan Bin
    FIRST INTERNATIONAL WORKSHOP ON KNOWLEDGE DISCOVERY AND DATA MINING, PROCEEDINGS, 2007, : 371 - 374
  • [34] A Supplier Selection Approach based on the Combination of AHP and Rough set
    Chen, Zhigang
    Yang, Tao
    Li, Hehua
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, INFORMATION AND MECHANICAL ENGINEERING (EMIM 2017), 2017, 76 : 1494 - 1500
  • [35] Supplier selection based on multi-criterial AHP method
    Hudymacova, Martina
    Benkova, Marta
    Pocsova, Jana
    Skovranek, Tomas
    ACTA MONTANISTICA SLOVACA, 2010, 15 (03) : 249 - 255
  • [36] A case based reasoning approach on supplier selection in petroleum enterprises
    Zhao, Kai
    Yu, Xin
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 6839 - 6847
  • [37] Research on estimation of equipment maintenance duration based on AHP-FIE risk analysis
    Dai Z.
    Yao L.
    Qin J.
    International Journal of Industrial and Systems Engineering, 2021, 38 (02) : 223 - 238
  • [38] AHP - Based Weighting of Criteria for Medical Equipment Selection
    Hajdau, Corneliu
    Spiridonica, Alexandru-Mihnea
    2015 E-HEALTH AND BIOENGINEERING CONFERENCE (EHB), 2015,
  • [39] Equipment selection based on the AHP and Yager's method
    Yavuz, M.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2015, 115 (05) : 425 - 433
  • [40] Location Based Advertisement Selection using Spherical Fuzzy AHP-VIKOR
    Oztaysi, Basar
    Onar, Sezi Cevik
    Gundogdu, Fatma Kutlu
    Kahraman, Cengiz
    JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2020, 35 (1-2) : 5 - 23